User's Manual
![](/manual/solum/st-gm3300n/1-user-s-manual-english/images/img-13.png)
S-TAG Datasheet(ST-GM33000)
Preliminary
REV 1.0
SOLUM CO.,LTD.
13/20
3 Operation Test
It will be updated before 2
nd
release. Below is just a sample.
Equipments : Gateway (S-Gate), R/C (S-TAG), Jig for power supply
Target DUT : EPD TAG
Figure 6 Operation Test
Test Scenario
① Install Tag on Jig
② Ready to Gateway(S-Gate) and R/C
③ wake up Tag with R/C
④ Tag start to communicate with Gateway
⑤ Tag display the numeric information received from Gateway
⑥ Check Tag(EPD display status & MAC address value)
⑦ Wake up Tag with R/C
⑧ Check Tag(EPD display(blank display))
Criterion (Below both two conditions should be all satisfied)
① Good : You can see ‘Black’ → ‘White’ display
② Compare MAC address with that of label attached to Front or Back plane.