Instructions / Assembly
A ILED BOLLARD INSTALL T ON GUIDE
WARNING
RISK OF FIRE, ELECTRIC SHOCK, INJURY OR PROPERTY DAMAGE.
l Risk of electric shock--Disconnect power from equipment before installing or servicing.
Install equipment according to all applicable codes and ordinances.
l Installation and service of this equipment must be performed by qualified se
r
vice
personnel.
l Carefully read instructions before installing, servicing or performing maintenance on equipment.
l Save instructions to use as reference for service or maintenance.
l Personnel responsible for installing equipment must ensure foundation is stable and capable
of supporting luminaire’s weight.
l Personnel responsible for installing equipment must use proper means to secure luminarie to ground.
CAUTION
l Edges may be sharp. Wear gloves while handling or servicing equipment.
l Inspect equipment for damage from shipping and handling.
l Recommended cleaning substances:
LUMINAIRE PREPARA
TION
Remove the luminaire (Fig 1) and accessories (Fig 2) from the carton and
inspect luminaire for damage. Do not install a damaged luminaire.
Anchor Bolt
Bollard Fixture
Anch
Allen Wrench
or Bolt Carrier
Nut
Flat Washer
Spring Washer
x3
Fig 1
Fig 2
INSTALLING BOLLARD
l Prepare site for installation. Assemble the anchor bolt carrier
(see Fig 3) to determine placement of anchor bolts to
concrete.
l Ensure that concrete base is suitable for bollard’s weight.
l
Fig 3
Fig 4
1-1/2~2”
Warning: Scouring powder and similar substances will scratch surfaces.
Wipe off dust with a dry, soft cloth. Remove greasy or soiled areas with a soft cloth
dampened in lukewarm water (<122° F/ 50° C) with a mild detergent.
Do not use detergents containing abrasive chemicals or solvents.
-
-
-
Install three anchor bolts into freshly poured, wet, reinforced
concrete (see Fig 4), with 1 to 2 inches protruding from
concrete. Threads should be free of any dirt and debris.
IC200BC