Operating Instructions and Installation Instructions
Installation
t
– 10
2
N
2
1
3
2
4
33
Slide the carriage (1) onto the chain (2) with chain guide (4). The chain (2)
engages in the chain wheel (3). If the chain wheel (3) does not rotate, pull
once on the emergency release cord (N). The chain wheel (3) is then
unlocked.
3
2
1
4
1
1
2
Insert the carriage with the chain (1) into the C-rail with the guide idler
“V” (2). The tip of the guide idler “V” must point toward the carriage.
Push the two rails (1) over the connecting sleeve (2) up to the stop
position. You now have a single continuous rail. When pushing the rails
together, ensure that the chain is guided through the guide idler “H”.
The tip of the guide idler “H” must point toward the carriage (1).
C
A
B
90°
D
5
a
c
90°
b
1
2
3
4
5
6
V
V
a) Hook the tensioner (1) into the chain (2).
b) Turn the tensioner 90°.
c) Push the slide-in part (6) in the rail and insert the tensioner. Put the
washer (5) and spring (4) on the tensioning screw (3) and screw the
tensioning screw (3) into the tensioning element.
6 7
10mm
V
Don’t tighten here; pretensioned at the factory.
Tighten the chain as far as the mark (arrow).
8
Disassemble the two steel brackets (1) with washers (4) and toothed
lock washers (3) from the ceiling suspension bracket (2).
91
0
17mm 17mm
1
2
2
4
1
3
V
Push the ceiling suspension bracket (1) onto the C-rail (2).
Fasten the two headers (2) with bolt (1) and washers (3) on the slide-in
part (4), but do not completely tighten yet.
Preinstallation of installation
variant B
NOTE!
Dispose of the packaging according to locally applicable
regulations.
Open the package and inspect the delivery scope.
ATTENTION!
Make sure that all components are not lying directly on a hard
surface. To protect the components, place cardboard, covers
or other soft surfaces underneath.
Remove the drive from the packaging.










