Operating Instructions and Installation Instructions
Installation
t
– 13
ATTENTION!
Always ensure that the drive is installed parallel to the
running rails of the door.
HM
17 18
B
600
0
1
B
1
HM
3
2
5
4
S10
Raise the drive.
Align the ceiling suspension bracket (1). The position should be in the
range of (W = 0 …600 mm).
Align the drive horizontally to the rear of the center of the door (HM).
Mark the drill holes. Drill two holes (Ø 10 x 65 mm deep).
NOTE!
Wear safety glasses when drilling. Take the thickness of the
ceiling into consideration, especially with regard to prefab
concrete garages.
Insert anchor ttings (1). Place U-washers (3) under the two bolts (2).
Firmly tighten the bolts (2).
Vertically align C-rails (4), e.g. with a spirit level. If required by this,
reposition the bolts (5). Tighten the bolts (5).
19
2
3
5
4
3
N
1
2
48
7
3
6
5
1
N
20
NOTE!
Choose suitable bolts depending on what the door is made of.
Wear safety glasses when drilling!
Install the push rod (1):
Insert the bolts lengthwise (2) and slide on the clamp (3).
Briey fasten door bracket tting (4) to the push rod (1) with bolts (5)
and slide on the clamp (3).
Pull once on the emergency unlocking cord (N). The carriage (1) is
unlocked. Tighten the bolt (8) on the header tting.
Slide the carriage (1) all the way to the front (3) with the push rod (2).
Loosen the guide idler (4) if necessary to do this.
Align the door bracket tting (5) with the center of the door (VM) and
mark 5 drill holes. Drill 5 holes (Ø 5 mm).
Insert 5 hex bolts (6) and tighten rmly.
Loosen guide idler (4) and completely slide onto the carriage (7).
Tighten the guide idler screw (4).
21
4
N
1
2
6
4
5
3
NOTE!
Shorten the protruding ceiling suspension bracket (4), e.g. by
cutting off and deburring.
Loosen the guide idler (1) and push it completely back to the stop
position (2). Open the door (3) by hand.
Push guide idler (1) all the way up to the carriage (5). Tighten the screw
on the guide idler (1).










