Operation Manual
Soundcraft Vi Series™ User Guide 1112 Page 25 - 5
Detailed Console Operation of VM
2
Setting up and using VM
2
monitoring on a Vi Series console falls into four simple steps:
• Connect up the HiQnet network as described in the previous section and check that the IP
address conguration is correct on all devices.
• Connect up the audio connections from the AKG Receivers to the console (either to Stagebox or
local inputs as appropriate).
• Associate each AKG receiver with a console connector using the mapping table in the Vi’s HiQnet
Setup page.
• The microphone monitoring information will now automatically be displayed on any channel strip
which uses an AKG-mapped physical input connector as its patched source.
The following pages describe in more detail how to carry out the second two steps. Note: Screenshots
shown are for Vi2/4/6. Vi1 will have same controls but layout will differ).