User Manual
Table Of Contents
9
ENGLISH
REALKIT-touch User manual
with wing nuts here.
2. Make the drum rack steady and adjust all the positions according the diagram
below. Then fasten all wing nuts.
3. 3.Add (1) and (2) to their clamps accordingly and adjust their position.
1.3. Components Installation
2
1
3
Cymbal Installation
1. Remove the wing nut, washer and felt pad from the
top of the rod.
2. Put the cymbal pad into the rod, then place back
parts removed in the step 1. Fasten the wing nut but
not too tightly. It allows the pad a little bit wobbling
like real acoustic cymbal.
3. Adjust the pad position then re-tighten the wing nut.
Snare and TOM Installation
1. Adjust the support hex rod to suitable position.
2. Loosen the bottom wing nut of the pad and insert it to
the support hex rod. Push the wing nut up a little bit
and shake the pad to insert it successfully.
3. Fasten the bottom wing nut after the pad is adjusted
to the suitable position.
2
3
1
Kick Installation
1. Align holes in the support stand (1) and pad (2), then
insert bolts and fasten with drum key (attached).
2. Insert tongue (3) of the kick stand into slot of the
pedal. Adjust to a suitable position, and then fasten
the wing nut on the kick pedal.
Sound module Installation
1. Align holes in the sound module and module mount
then insert screws and fasten it.
2. Insert rod of the supporting board into the clamp,
then tighten the wing nut.
Finalizing the Installation
After install all components, ne adjust the arm, clamps
and rods to the best position you desire.
Electronic Connection
Connect the trigger connector cable plug to the bottom
of the sound module, and then connect all cable heads
according to their name tags.










