Installation Guide

SOUTHWEST WINDPOWER DOCUMENT 0228 REV A
4
Wire set 1
Tower Base Staples 2
3/8” x 1 ½” Bolts 2
3/8” Locknuts 2
Cable Thimbles 4
Cable Clamps 8
Figure 1 (Parts List)
Tools Needed:
Round or Half Round File
5/16” or 8mm Wrench, Socket or Nut Driver (preferred)
(2) 9/16” or 15mm Wrenches or Sockets
Sledge Hammer
Pliers
Carpenters Level
5/16” allen wrench (supplied with turbine)
Items Not Included In This Kit:
Anchors (The type of anchors used will depend on the soil conditions at your tower site. This is
explained further in the “Anchors” section of this manual.)
Ground Rod and Clamp *
Lightning Arrestor *
Junction Box and Adapter *
Flex Conduit and Fitting *