Operation Manual

Page 29 of 57
RD-OI-20 A/3
4.2.2 CareView 750C
1 Review the figure below for the position of the four mounting holes on the back of the detector
case.
Figure 22 Mounting Holes
2 Install the detector into the bucky. Make sure all the mounting bolts are screwed properly and
firmly.
3 Connect the detector to the power box.
Connect one end of the interface cable with detector cable and verify that the red marks are
aligned.
Plug the other end of the interface cable into the ‘PORT’ on the power box and tighten the
mounting screws.
Figure 23
4 Connect the LAN cable into the power box and computer.