Installation Guide

INSTRUCTIONS FOR MODELS
92-SA-2209-02
For additional assistance or service please contact:
SPEAKMAN
®
Company
400 Anchor Mill Road
New Castle, DE 19720
800-537-2107
customerservice@speakman.com
www.speakman.com
SA-2209
TOOLS AND SUPPLIES
SAFETY TIPS
Be sure to wear eye protection.
MAINTENANCE
Your new Speakman Product is designed for years
of trouble-free performance. Keep it looking new by
cleaning it periodically with a soft cloth. Avoid
abrasive cleaners, steel wool, and harsh chemicals
as these will dull the finish and void your warranty.
WARRANTY
Additional warranty information can be found at:
www.speakman.com
Level
1/4“ Tile Drill Bit
(if mounting to tile)
Hammer
Drill with 1/4” bit
or 1/2 “bit
Phillips
Screwdriver
Flat Tip
Screwdriver
Measuring
Tape
Pencil
HELPFUL TOOLS & SUPPLIES:
REQUIRED TOOLS & SUPPLIES:
1
The Mounting Plates (1) come pre-installed
in the Brackets (2). Remove the Mounting
Plates by loosening the pre-installed set
screw at bottom with the included Hex Key.
2
Place Mounting Plates into desired position
using a level to position them accordingly.
Mark mounting hole locations with a
pencil. Remove Mounting Plate from wall.
18
"
457mm
3
Align Mounting Plate over center point marked
in previous step. Mounting Plate should be
vertical with Notch in the cylinder (1) pointing to
the bottom as shown below. Mark Mounting
Screw locations onto the wall surface. Remove
items after marking mounting locations.
4
If mounting directly to wood stud, Plastic
Anchors are not required. If using anchors,
select proper drill bit for mounting location.
Drill ¼” holes in marked locations.
ؼ”
OR
5
Insert Plastic Anchors into drilled holes and
tap lightly with Hammer to fully seat Plastic
Anchor into the hole.
6
Secure Mounting Plate with the Mounting Screws
provided. Verify that the Mounting Plate is
aligned vertically.

Summary of content (2 pages)