Installation
6
• Assemble the Lever Handle Assembly (16)
to Ball Valve (5) using Nylo-Hex Nut (17),
being sure to orient the Handle as shown
below.
• Insert the slot in the Pull Rod (20) over the
Lever Handle Assembly (16) and insert
Pin (18).
• Secure Pin (18) with Cotter Pin (19).
7
• Assemble 1-1/4” x 6“ Pipe (21) to Drain/
Supply Cross (12).
• Install Street Elbow (22), making sure
the male threading is plum.
• Assemble the 1-1/4” Bowl Mounting
Spud (23) to Street Elbow (22), making
sure the top surface is level.
BOWL GROUP AND
EYE/FACE WASH REFERENCE
• SE-603 Series
Includes SE-400 Eye/Face Wash Unit with
Aerated Sprays and Stainless Steel Bowl
• SE-616 Series
Includes SE-505 Eyewash Unit with Aerated
Sprays and Stainless Steel Bowl
• SE-690 Series
Includes SE-490 Eye/Face Wash Unit with
Soft Flow Sprays and Stainless Steel Bowl
• SE-693 Series
Includes SE-582 Eyewash Unit with Aerated
Sprays and Stainless Steel Bowl
• SE-695 Series
Includes SE-495 Eye/Face Wash Unit with
Soft Flow Sprays and Plastic Bowl
• SE-697 Series
Includes SE-580 Eyewash Unit with Aerated
Sprays and Plastic Bowl
8
• Assemble Eyewash Assembly (24) by
aligning the Strainer Drain thread on
the Eyewash with the Bowl Mounting
Spud (23) on Stanchion.
• Secure Eyewash by tightening Strainer
Drain with a 7/16” Allen Wrench, making
sure the Eyewash Assembly (24) is level
once fully tightened.
Note: Your Bowl and Eyewash appearance
may vary depending on model. Image shown
is for reference only. Install Bowl group as
described. Reference additional technical sheets
(supplied) for information on the bowl assembly.
Before any maintenance is done be sure to shut
the water supply off.