Software Instruction Manual
Table Of Contents
- Table of Contents
- Introduction to ProMark Field
- Installing ProMark Field
- Getting Started With ProMark Field
- Creating a New Job
- Importing/Exporting Jobs
- Running a Post-Processed Project
- Using Your Rover in a Real-Time RTK Project
- Changing the Storage Medium for Raw Data Collection
- Initialization
- Logging with Offsets
- Setting an RTK Base
- Installing Geoids
- Adding Background Maps
- E-Compass & External Device
- Index

English
29
Choose what’s best for you, depending on your speed
along the line.
• Offset tab: See Line Offset on page 50.
• Tap OK to mark the beginning of the line.
“Logging...” then appears on the screen and you can see
the line being plotted on the map (i.e. a series of points)
as you walk along, based on the real-time position solution
computed by the receiver.
• When you reach the end of the line, select Menu > Stop.
You may use the Pause/Resume function in the Menu when
the line is discontinuous. While in pause, ProMark Field
stops marking points according to the chosen time or
distance rate.
• When you are finished with the job, select Menu, Exit to
close the job and quit ProMark Field. This will
automatically close the raw data file.
NOTE: The rover will automatically start collecting raw
data next time you run ProMark Field, unless you clear the
Record raw data for post-processing option (in Menu>
Configuration >Rover >Settings, Recording tab) before you
quit ProMark Field.
Quick Start to
Post-Processing
Raw Data
Assuming raw data files (G files) were collected directly on
SD Cards, one by the base, another by the rover, do the
following:
• Copy the G files from the rover and the base to your
computer.
• With Spectra Precision Survey Office (SPSO):
– Run SPSO.
– On the start page, click on Start new project.
– Click OK.
– Drag and drop the G files from the base, then from the
rover, onto the Plan View.
– Confirm/reject each G file by respectively checking or
clearing the Import box in the first column.
– Click OK.
– Define the projection used and click OK to import the
files.
– Click on Survey in the menu bar and select Process
Baselines. SPSO will then process all the baselines.
– Click on the Save button to save all the processing
results.
– Save the project.