Software Instruction Manual
Table Of Contents
- Table of Contents
- Introduction to ProMark Field
- Installing ProMark Field
- Getting Started With ProMark Field
- Creating a New Job
- Importing/Exporting Jobs
- Running a Post-Processed Project
- Using Your Rover in a Real-Time RTK Project
- Changing the Storage Medium for Raw Data Collection
- Initialization
- Logging with Offsets
- Setting an RTK Base
- Installing Geoids
- Adding Background Maps
- E-Compass & External Device
- Index

English
31
Example of file name for second file logged on Site ID 85X2
on June 6th 2011:
G85X2B11.157
NOTE 2: The ProMark Field job file is of no use in the post-
processing step. However, when defining control points in
GNSS Solutions, the job file may be useful as a separate
memo, for example to copy the coordinates of the point where
the base was declared to be installed (cf. Site tab and Site ID
field).
NOTE 3: There is no implicit “connection” between a raw
data file logged by a receiver and the job file that was open
at that time. It is therefore your responsibility to create this
“connection” if that makes sense for your project.