Installation Instructions

IA\
~~
METAL SALES, I
NC
.
ALUMINUM
GUTTER
SYSTEMS
Read
through
these
diredions
prior
to
installation
Installation
Instructions
GET
READY!
TOOLS
NEEDED
o
la
dde r 0 Hack Saw
o level 0 String
o Tin Snips 0 Pliers
oScrewdriver
o Hammer
oTapeMeasure
o Safety Glasses
STEP
1
INSPECTION
Remove the old gu
tter
and
inspect the fascia boa rd for
damage. Repair or replace any
damage if
necessary
.
STEP
2
DOWNPIPE
LAYOUT
Identify where the downspout(s)
w ill be located .
STEP
3
Use a chalk line or guide string to mark
the slope of the
gutter
. On the non -
downspout
end. tack the line close to the
raotline. At the
downspout
end, you wan t
to tack the line slig
htly
lower, at an angle
of
1 inch for every 40 feet. This will
allow
water to flow to the downspout. Mark the
line and remove. Repeat if necessary.
STEP
4 ASSEMBLE
lllE
GUTTER
Make sure the
downs
pout
is
in the proper location.
All end
caps, end
pieces. joiners, slip join
connectors
need to be secured
wit
h screws. Seal all the areas
whe
re the different pieces come
together and
where
fasteners
protrude into the
gutte
r.
STEPS
CSJ)
~ ~
Hang
th
e
Gutter
.
Decide
on wtuch
Screw
Fernlie
Snap
Lack
"
__
Hidden_
Spike
Ferrule
__
hanger
Fascia
Bracket
w/screw
w_
system
to use to
Insert Ferrule Nail
onto
fascia Roll the hanger Roll the hanger Insert Ferrule Use this only
support the
gutter One
into
top part board aligning under the front under the
front
under the when there is
(1) hanger
of the
gutte
r.
the top of the
lip of the
gutter
lip of the
gutter
frontline of the no fascia board .
system is
Drill the screw bracket wi th
and snap the and snap the
gutter
. Use
SEE
PACKAGE
to be used
through
the
the chalk line.
back
into
place. back into place. a hammer to
INSTRUCT
IONS.
every 24
Inch£'<;
gutter
and
SEE
PACKAGE
Drill the screw Drive a nail or drive the spike
ferrule and
into
INSTRUCT
IONS.
through
the screw th rough
through
the
the fascia board. back of
the the backside of
gutte
r and
SEE
PACKAGE
gutter
and
into
the
gutter
ferrule and
into
I
NSTRUCTIONS.
the fascia board. and into the the fascia board.
S
EE
PACKAGE
fascia board . S
EE
PACKAGE
INSTRUCTIONS
.
SEE
PACKAGE
INSTRUCTIONS
.
INSTRUCTIO
NS.
STEP
6
HOW
TO
HANDLE
CORNERS
If you need to
turn
a corner on your house, a box
miter
is used.
Mite
r is
installed to
gutter
with
a slip
joint
connector or joiner . see package for
instructions.
STEP
7
ASSEMBLE
THE
DOWNSPOUTS.
ELBOWS
The
downspout
and elbows are designed
with
one end smaller than the
other. The parts are joined by
fitting
the larger end of one over the smaller
end
of
the
other
and a screw is used to hold
them
together. The large end
should always face up. Two
elbows are used to connect the
gutter
to the
downspout. An extension piece may be needed . Cut and place be
tween
the
elbows to make the downspout fit flat on the wall'. Place an el
bow
(front or
side facing) at the
bottom
of the
downspout
to direct water away from the
house foundation.
STEP
B
ATTACH
THE
DOWNSPOUTS.
ELBOWS
Placetop
elbow
onto
out
let. fasten or
mount
to wall
with
Downspout Bands- two (2) for every 10 feet of
down
pipe.
Downspout
Band is wrapped around 3 sides of
downspo
ut and
fastened
with
a screw and secured to wall. Go back and secure
top
elbow
to o
utle
t
with
screws.