Instructions / Assembly

Step 4
Slide the hanger body to the desired
position and secure into place by using
the lock screw or by installing a sheet metal
screw thru the pilot holes in the hanger arms
into the hanger body. This additional screw
provides added strength. See Figure 3
Installation Instructions
Please read before installation
Dust, Debris & Test Cover
866-794-7900 Step 1
www.speediboot.com Speedi-Boot Dust & Debris Cover prevents
construction dust, debris, texture
Installing Speedi-Boot spray, primers, paints and stains
Step 1 from contaminating the duct work system
After the location of the vent boot has been and HVAC equipment. This assists in
determined, make a measured mark on the Figure 3 maintaining the efficiencies & capacities
left and right truss-joist for square
Optional Positioning of the HVAC system and improves the
and straight installations. Indoor Air Quality of the structure.
Step 2 The hanger arms come assembled on the See Figure 6,7
Extend the hanger arms & place one end of long side of the hanger body. A slide stop
the arms on top of the truss-joist (if possible) at the end of the arms prevents them
for temporary support. See Figure 1 from sliding apart during installation.
Step 1
The arms may be removed by sliding the arms
apart with a quick motion separating the
two pieces. Reassemble the arms into the
extended tabs. The hanger arms may be Figure 6
shortened to fit narrow framing by breaking
Step 2
at the score points on both arm pieces. The Speedi-Boot’s Dust & debris Cover may
See Figure 4 also be utilized as a plug to perform Duct
Figure 1 Pressure Testing against. This feature will
Step 3 eliminate the necessity to plug each
Place the hanger bar feet flush with the supply and return location increasing the
bottom of the truss-joist and hammer the Speed of the testing procedure.
attached nail into the truss-joist. Install an
Trim Installation
additional nail or screw thru the provided
Step 1
pilot hole on either side of the nail cradle The Speedi-Boot’s rigid Mud-Ring provides
This prevents the hanger arm from a sturdy edge for the sheet rock installer
twisting and the hanger body from flexing to cut against at each vent boot
during trim register installation. Figure 4 penetration. This prevents boot
See Figure 2 Floor Installations deformation and provides a more
There are four pre-piloted holes in the four corners
consistent and Speedi trim installation
of the Speedi-Boot to fasten to the bottom process. See Figure 6,7
of the floor decking with sheet metal or wood
screws. You may also use the trim register
Step 2
pilot holes and the hanger arms to secure to Pre-Pilot holes in the Speedi-Boot frame
the floor decking. This creates a tight fit and provide a more solid Register trim
. compresses the rubber gasket to the floor installation. This provides Speedi i
deck eliminating air leakage. The hole in the
nstallations and solid register backing
floor decking must be cut 3/8” larger than
that prevents loose or saggy register trim
the outer mud-ring dimension. installations. See Figure 6

Summary of content (1 pages)