Installation Guide
Secure the inner core to the Speedi-Boot collar with approved flex foil tape
smoothing out any wrinkles for an air tight seal. Slide the insulated outer
jacket over the Speedi-Boot collar and secure with a zip-tie and trim off the
excess zip-tie as necessary, (See Figure).
Task 7: Ductwork Connection-Speedi-Collar
Locate the closest connection point of the supply air trunkline to the Speedi-
Boot location and mark on the trunkline using the marking template, cut the
trunkline material (either sheet metal or ductboard) with the appropriate
tools (See Tools Required on Pg ) and install the Speedi-Collar (See Speedi-
Collar Instructions) into the supply air trunkline. (See Figure )