Spencer® Single-Stage Scroll Blowers Serial No: Model No: Installation, Operation and Maintenance Instructions Important Read and become familiar with this manual prior to uncrating and installing your Spencer Scroll Blower. Following the instructions detailed here will help you realize its full potential of efficient service and extended lifespan. Damage resulting from failure to follow correct procedure will void the warranty. The Spencer Turbine Company Windsor, Connecticut 06095 Form FF12.
Contents I II III IV V VI Page General Instructions . ............................................. 2 Operation and Adjustments..................................... 5 Typical Scroll Blower .............................................. 7 Replacement Parts................................................. 9 Lubrication Instructions............................................ 9 Trouble Shooting Guide .......................................
Rubber Inlet and Outlet Sleeve The rubber connecting sleeve supplied with the scroll should be installed so that it covers a gap of approximately one inch as illustrated. The mounting clamps supplied with the sleeve should be adequately tightened to effect an air-tight connection.
Coupling alignment lines up the motor shaft and blower shaft in horizontal and vertical planes. It also ensures an adequate clearance (gap) between the two coupling halves. Only qualified personnel should attempt to align a coupling. If problems arise, contact Spencer or your Spencer Representative. Sier Bath Gear-Type Couplings, manufactured to our rigid specifications, are most commonly supplied with Spencer equipment. Sier Bath Coupling Size, In. 7/8 1-1/2 2 2-1/2 3 3-1/2 4 4-1/2 5 Hub to Hub Gap, ln.
Coupling Alignment with Sleeve Bearing Motors Caution: Complete the following procedures before attempting coupling alignment with sleeve bearing motors. Use a flange-type gear coupling for both 1800 and 2600 RPM motors. Do not use a sleeve-type coupling. Sleeve bearing motors have a specified end play. End play limits and the magnetic center (where motor will run) should be scribed on the shaft by the manufacturer. Use the following procedure to align a sleeve bearing motor with a blower. 1.
• Is the control panel energized? • Have maintenance and operations personnel been notified? CAUTION: This blower must have adequate system resistance at all times to avoid operation at or near free delivery (wide open). It Is typically imposed by the process and supplemented with a throttling valve. Running the blower overloaded will damage the motor. Start Up Caution: It is very important that the blower be installed with regard to the correct direction of rotation.
removal of the end head on the other. Removal of the end head provides immediate access to the impeller. To disassemble the scroll blower, proceed as follows: Remove the bolts (8) securing end head (4) to the casing assembly. Remove the end head. Measure or mark position of impeller on the shaft, loosen the three (or six) Allen socket screws three full turns, tap the heads of the screws. This will loosen the impeller from the tapered bushing allowing removal. Remove the bolts holding the motor in place.
Arrangement 8: Four-Bearing Overhung Design 9 4 1 2 3 5 8 6 7 Recommended spare parts 1 - Flexible Coupling 2 - Coupling End Bearing 3 - Blower End Bearing 4 - Division Head Packing 5 - Shaft 6 - Impeller 7 - End Head Gasket 8 - Drive End Motor Bearing 9 - Opposite Drive End Motor Bearing The Spencer Turbine Company ◆ 600 Day Hill Road, Windsor, CT 06095 ◆ TEL 800-232-4321 ◆ 860-688-8361 ◆ www.spencerturbine.
IV. Replacement Parts V. Lubrication Instructions How to order replacement parts When ordering replacement parts, it is important that the information you furnish to Spencer is correct. Be sure when reading nameplates that you obtain the correct information. Remember, the more complete the information, the quicker the order will be processed; incomplete information will result in unnecessary delays and expense through callbacks. When in doubt, consult the factory for further information.
VI. Trouble Shooting Guide Trouble Probable Cause Corrective Action Insufficient air through system Low pressure or vacuum as determined by measurement with a manometer: – Incorrect rotation. Change motor leads to correct rotation. – Machine sized for requirements given, but air lines too small Increase line sizes or install machine providing higher causing excessive frictional loss. output pressure. – Valves in line, causing excessive losses.
Spencer Single-stage Scroll Blowers Standard Features Flanged outlet with standard ANSI B16.5 125lb/150lb drilling for ease of installation. Heavy-duty 3⁄16" welded steel housing and motor support. Heavy-gauge steel absorbs shock of sudden back pressure. If damaged, sections can be repaired or replaced. Six standard outlet positions provide flexibility of air piping placement and layout. Standard shaft motor. ODP or TEFC motor enclosure is standard.
Spencer Corporate Headquarters and Manufacturing Plant, Windsor, CT USA Products & Services Industrially rated products offering effective solutions for air and gas handling problems: • Valves, gauges, couplings, shrink sleeves, vibration isolators and other system components • Multistage centrifugal blowers • Comprehensive selection of tubing, fittings, vacuum hoses, valves and tools • Single-stage centrifugal blowers • High speed turbo blowers • Gas boosters and hermetic gas boosters • Regenerative b