Operation Manual

XBR95 & XBU75
9
STEP 2: CONSOLE MAST ASSEMBLY
1. Install the Console Mast Cover (31) onto the console mast (2). Make sure the plastic cover is in
the correct orientation.
2. Feed the computer cable (44) and Switch Cable (148) though the bottom of the console mast (2)
and out though the opening at the top.
3. Install the console mast (2) into the receiving tube (make sure not to pinch the wire cable as
damage to the electronics could occur) of the Main Frame with the six 5/16 Hex Head bolts
(68), four 5/16 Flat Washers (76) on the sides of the tube and two 5/16 Curved Washers (83)
on the front of the tube by using the 12/14mm Wrench (112).
4. Remove the white Styrofoam pad (factory installed to prevent bolts from being accidentally
dropped into the Bike).
5. Install the Handlebar (3) onto the Console Mast (2) with the two 5/16 x 15mm Hex Head Bolts
(68), two 5/16 x 19 Flat Washers (76) and two 8m/m Split Washers (82) by using the 12/14mm
Wrench (112).
6. Install the Upper Computer Cable (44) and Switch Cable (148) into the connector in the back of
the Console (19). Install the console onto the mounting plate with the four M5x12mm Phillips
Head Screws (99)