User's Manual

MOUNTING THE DU AND CU
SpotCell® 100 Series 19
Mounting the dual band (SC14x) CU
1. Find a suitable location to mount the unit that will provide good signal coverage.
Refer to section 3.3 "Choosing a location for the SpotCell CU".
2. Fasten the mounting bracket insert to the back of the CU.
Figure 4.12: Fasten mounting bracket insert to
SC141/142 CU
3.
If mounting on a solid wood surface, or stud covered by drywall, drill a 1/8th inch
diameter hole at least 4.5 inches from the ceiling (to allow the CU to slip into the
bracket) and then fasten the mounting clip with #6 x 1.5” screws.
or
If mounting in drywall, drill a ¼ inch diameter hole at least 4.5 inches from the ceiling
(to allow the CU to slip into the bracket), insert the screw anchors, and then fasten
the mounting clip with 1/2” screws.
4. Mount the CU by sliding the insert into the bracket.
5. Attach cables to the wall using tie wraps and mount directly to the wall where
possible (using 1/2 inch pan head screws). If an anchor is required drill a 3/16 inch
diameter hole, insert the anchor, and fasten with 1/2 inch screws.
Mounting other (non dual band) CUs
1. Find a suitable location to mount the unit that will provide good signal coverage.
Refer to section 3.3 "Choosing a location for the SpotCell CU".
2. If mounting on a solid wood surface, or stud covered by drywall, drill a 1/8th inch
diameter hole and mount with #6 x 1.5” screws.
or
If mounting in drywall, drill a ¼ inch diameter hole, insert the screw anchor, and then
mount with a 1/2” pan head screw.
3. Attach cables to the wall using tie wraps and mount directly to the wall where
possible (using 1/2 inch pan head screws). If an anchor is required drill a 3/16 inch
diameter hole, insert the anchor, and fasten with 1/2 inch screws.