User's Guide

Table Of Contents
INSTALLATION
20 SpotCell
4. Ensure the switch on the CU is in the ‘Install’ (1) position.
Figure 4.2: CU switch location
5.
For dual band systems (SC141/SC142) set the adaptive processor
(AP) switch to “AP2” (Cell).
For split mode systems (SC111S/SC112S), the AP switch can be in
either position if both bands are currently active, otherwise the AP
switch must be set the active band.
6. Plug the power supply adapter into a wall socket.
7. To align, hold the DU upright and:
Indoors Roof External wall
Slowly rotate the face
of the DU from left to
right in front of the
window.
If not in front of a
window, rotate the DU
in a complete circle.
Slowly rotate it in a
full circle. A time of 10
seconds (30 seconds
for the SpotCell 163)
is appropriate to fully
complete the rotation.
Slowly rotate the face
of the unit from left
to right within the
constraints allowed by
the wall.
CU
switch
window
wall