Square D® Service Upgrade Load Center Innovative design for faster, easier installation.
Service Upgrade Load Center The Square D Service Upgrade Load Center is designed to make challenging flush-mount service upgrade jobs faster, easier and cleaner. Feeding wire into a flush-mount load center enclosure while not damaging drywall is one of the hardest parts of a service upgrade job. With the Square D Service Upgrade Load Center and longer cover accessory, you’ll realize all the benefits of a clean changeout from the leader in residential electrical distribution products.
a b c d a. Longer cover included with value pack b. Inside view of load center c. End view of load center with plates installed d.
Ordering Information Catalog Number HOM3040M200EPVP UPC code: 7-85901-54177-6 Description Load center (main breaker) 30 space – 40 circuit with removable end plates and longer load center cover included * Wire is available in copper or aluminum Amps Wire Size* 200 #4-250
Product Features • Available in Homeline® (30 space, 40 circuit, 200 A, main breaker) • Each load center ships with four end plates: −− Two plates with five ½ in. knockouts, two ¾ in. knockouts −− Two plates with four ½ in. knockouts, one 1¼ in. knockouts • Longer cover is included; this overhangs the enclosure by 2¾ in. at the top and 3 in. at the bottom Dimensions (in.) Spaces Max. Tandem Circuit Breakers Total Circuits Width Length Depth 30 10 40 14.25 33.78 3.
Step-by-Step Remove the existing load center from the wall. Using the Square D Service Upgrade Load Center as a stencil, mark a “cut-line.” Cut out the template drawn on the drywall. Be careful not to cut existing wire. Put an S-bend in the wires that will enter the bottom of the enclosure and push them down into the wall cavity. Bunch the top-feed wires together and feed them through the holes in the endwalls. Slide the Square D Service Upgrade Load Center up into position (Easy!).
Feed individual wires through the knockouts of the removable end plates. Make sure the side stating “OUT” will face the outside of the enclosure and slide the removable plates up the wires. Pivot the wire-loaded end plate and screw into position.* Some drywall damage above or beneath the enclosure can be covered up by the Square D Service Upgrade Load Center’s longer cover. Continue to wire the device as you would with a traditional load center.
Testimonial “I think the Service Upgrade Load Center is a fantastic product! It made my life a lot easier. I could feed wire into the box more quickly than usual, with very little damage to the drywall. I saved myself 30 to 40 minutes and I do service upgrades all the time; there’s no telling how much time a less experienced contractor could save!” “I’m also keen to use this load center in flush-mount applications for residential new-build.