User's Manual

Introduction
9
1.2 STS Setup Overview
The set up of the STS site equipment consists of six phases as shown in Figure 1.2. Each phase must
be conducted in the order provided to ensure the proper installation of the equipment.
The six phases to set up the STS site equipment include:
1. Preparation: describes the pre-installation requirements for the STS site.
2. STS Antenna Installation: describes the procedures for installing the STS antenna.
3. STS Installation: describes the procedures for installing the STS.
4. STS Power Pack Installation: describes the procedures for installing the STS Power Pack.
5. STS Configuration: describes the procedure for configuring the STS.
6. STS Antenna Alignment: describes the procedure for aligning the STS antenna.
Figure 1.2 STS Setup Overview
RS03061301
1
Preparation
2
STS Antenna
Installation
3
STS Installation
4
STS Power Pack
Installation
5
STS Configuration
6
STS Antenna
Alignment