Cut Sheet
161
www.ssac.com • 800-843-8848 • fax: 605-348-5685
Delay-on-Make/Recycle: (ProgramaCube
®
Function MRE)
OPERATION: Upon application of input voltage, TD1 begins and the output (relay or solid state) remains
de-energized. At the end of TD1, the TD2 recycle function begins and the output (relay or solid state)
cycles ON and OFF for equal delays. This cycle continues until input voltage is removed.
RESET: Removing input voltage resets the output and time delays, and returns the sequence to the
rst delay.
See: KSPD, KRPD, NHPD, HRPD, TRDU
Delay-on-Make/Single Shot: (ProgramaCube
®
Function MS)
OPERATION: Upon application of input voltage and the closure of S1, TD1 begins and the output (relay
or solid state) remains de-energized. The output (relay or solid state) energizes at the end of TD1, and
TD2 begins. At the end of TD2, the output (relay or solid state) de-energizes. Opening or reclosing S1
during timing has no affect on the time delays.
RESET: Reset occurs when the time delay is complete and S1 is open. Removing input voltage resets
the time delay, output, and the sequence to the rst delay.
See: KSPD, KRPD, NHPD, HRPD, TRDU
Interval/Recycle: (ProgramaCube
®
Function IRE)
OPERATION: Upon application of input voltage TD1 begins. At the same time, the TD2 ON time begins
and the output (relay or solid state) energizes. At the end of the ON time, the TD2 OFF time begins and
the output de-energizes. The equal ON time OFF time cycle continues until TD1 is completed at which
time the output de-energizes.
RESET: Removing input voltage resets the time delays, output, and the sequence to the Interval function.
See: KSPD, KRPD, NHPD, HRPD, TRDU
Delay-on-Break/Recycle: (ProgramaCube
®
Function BRE)
OPERATION: Upon application of input voltage and the closure of S1, the TD2 ON time begins and
the output (relay or solid state) energizes. Upon completion of the ON time, the output de-energizes
for the TD2 OFF time. At the end of the OFF time, the equal ON/OFF cycle repeats. When S1 opens,
the TD1 delay begins. TD1 and TD2 run concurrently until the completion of TD1 at which time, the
TD2 ON/OFF cycle terminates and the output de-energizes. The output energizes if S1 is closed when
input voltage is applied.
RESET: Reclosing S1 during timing resets the TD1 time delay. Removing input voltage resets the time
delay, output, and the sequence to the Delay-on-Break function.
See: KSPD, KRPD, NHPD, HRPD, TRDU
Delay-on-Make
Recycle
Delay-on-Make
Single Shot
Interval
Recycle
Delay-on-Break
Recycle
Interval
Delay-on-Make
Interval/Delay-on-Make: (ProgramaCube
®
Function IM)
OPERATION: Upon application of input voltage, the output (relay or solid state) energizes and TD1
begins. At the end of TD1, the output de-energizes and TD2 begins. At the end of TD2, the output energizes.
RESET: Removing input voltage resets the time delays, output, and the sequence to the rst delay.
See: HRPD, KRPD, KSPD, NHPD, TRDU
Single Shot/Recycle: (ProgramaCube
®
Function SRE)
OPERATION: Upon application of input voltage and the closure of S1, TD1 begins. At the same time,
the TD2 ON time begins and the output (relay or solid state) energizes. Upon completion of the ON
time, the output de-energizes for the TD2 OFF time. At the end of the OFF time, the equal ON/OFF
cycle repeats. TD1 and TD2 run concurrently until the completion of TD1 at which time, the TD2 ON/
OFF cycle terminates and the output de-energizes. Opening or reclosing S1 during timing has no affect
on the time delays. The output will energize if S1 is closed when input voltage is applied.
RESET: Removing input voltage resets the time delay, output, and the sequence to the rst delay.
See: HRPD, KRPD, KSPD, NHPD, TRDU
Single Shot
Recycle
Single Shot/Lockout: (ProgramaCube
®
Function SL)
OPERATION: Upon application of input voltage and momentary or maintained closure of S1, the output
(relay or solid state) energizes and TD1 single shot time delay begins. The output relay de-energizes at
the end of TD1 and the TD2 lockout time delay begins. During TD2 (and TD1) closing switch S1 has no
effect on the operation. After TD2 is complete, closing S1 starts another operation. If S1 is closed when
input voltage is applied, the output energizes and the TD1 time delay begins.
RESET: Removing input voltage resets the time delays and the output and returns the cycle to the rst
delay.
Single Shot
Lockout
Timer Functions
Two Functions in One Timer
Appendix A - Timer Functions