Installation Instructions

29
6. PENETRATIONS
a. Tape Flashing is applied in two layers a minimum of eight
inches (8") above the roof deck.
b. Pipe Boots are terminated with a Pipe Boot Steel Clamp
and are caulked with Rubber Caulk.
7. METAL EDGE DETAIL
a. Metal Edge is prepped (cleaned with seam primer), and of
sufcient gauge and adequately fastened to withstand wind
uplift.
b. Properly stripped in using ve inch (5") wide Cover Strip.
Cover Strip should extend a minimum of two inches (2")
beyond any fastener.
8. OVERALL APPEARANCE
a. Termination Bars are level.
b. Seam widths are uniform and completely rolled in.
c. All trash or debris is removed from job site.
NOTE: OVERALL APPEARANCE IS VERY IMPORTANT.