Installation Instructions

18
WHITE PIPE BOOT AND CLAMP: Pre-molded white
boot. The most cost effective way to flash pipe protrusions.
The stainless steel clamp is used to secure the top of the pipe
to the Pipe Boot.
WHITE CAULK: Applied at the top of all Fastening/
Termination Bar applications; at the top of Pipe Boots and after
the Pipe Boot Clamp has been installed, seams, patches, and to
adhere shingle tabs to RoofKit White Roofing Membrane.
SEAM PRIMER: Solvent based primer used to clean and
prime the RoofKit White Roofing Membrane before applying
White Seam Tape or any cured or uncured tape backed mem-
brane. Applied using a scrub pad. DO NOT APPLY PRIMER
DIRECTLY TO TAPE. Primer is only applied to surfaces
being prepared to accept tape products.
WHITE MEMBRANE SEAM TAPE: White butyl tape
used to splice two layers of membrane into a watertight seam.
Available in a width of three-inches (3").
SIX (6") REINFORCED STRIP: RoofKit Reinforced Strip
is six inches (6") wide. Used with RoofKit Multi-Purpose
Bonding Adhesive and Fastening Screws and Plates to secure
base flashings at walls and curbs (chimneys, skylights, etc).
SUBSTRATE: The surface on which the membrane is applied
(brick, concrete block, high-density wood fiberboard, ply-
wood, OSB, isocyanurate insulation). NOTE: Should not be
applied to asphalt roofing, shingles, or polystyrene insulation.
T-JOINT: An area formed when two layers of RoofKit White
Roofing Membrane form a seam that travels under, or over, a
third layer. The center of the "T" is where the middle layers
ends and the top layer bridges over the middle layer.
WATER STOP: Used to create a waterproof compression
gasket whenever the RoofKit White Roofing Membrane is
mechanically fastened using a Fastening/Termination Bar or
Pipe Boot Steel Clamp. Water Stop is applied between the
membrane and the pipe or wall. The mechanical termination
is installed over the membrane, compressing the Water Stop
and creating the gasket. Also used for all gasket seals at drain
clamping rings.