Installation Instructions

16
Keep the bottom course of shingles a minimum of four inches
(4") above the roof angle change. To adhere the bottom course
of loose shingle tabs to the membrane, lift each tab and apply
a bead of RoofKit White Membrane Caulk.
PATCHING ROOFKIT WHITE ROOFING MEMBRANE
Using scrub pad, clean entire
area with RoofKit Seam
Primer. Allow to dry.
Remove paper backing
from 8" round patch and
position the patch over the
damaged area.
Use the seam roller to
ensure good contact.
Caulk around the patch with
RoofKit White Caulk.
Step 2
Step 1
Step 3
Step 4