Installation Guide

© 2013 SureWood-LNL All Right Reserved | p 6
Post-to-Post Staircase Parts Checklist:
3
Check local building codes to ensure compliance.
All stair parts shown in this brochure are for interior use only.
Part number
Selected
Quantity
Needed
*Note: These guidelines are for a rake handrail height of 36“– 41“.
Longer newels and balusters may be required for a different handrail height.
Treads - Select one tread for each step.
Risers - Select one riser for each step (except the starting
step). Select one more riser than treads per each staircase.
Landing Tread - Select sufficient lineal footage for the entire
balcony and width of stairs at each landing.
Return Nosing - If stair is open on one side, select one tread
return nosing per step. If two-sided, select two per step.
Starting Fitting - Select either a Volute, Turnout, or Starting
Easing.
Starting or Landing Newel* - Use at the bottom of the
stairway and at the second floor landing. If the balcony is 10
feet or longer, use the starting newel every 5 or 6 ft. Place a
newel at every corner under a quarterturn.
Intermediate Landing Newel* - Use at the intermediate
landing corner of a U-or L-shaped stair.
Rosette - Select a rosette for each handrail connection into
a wall.
Newel Mounting Hardware: - Select one newel mounting
kit for each newel post mounted on top of a tread.
Balusters for Starting Fittings* - Each volute requires
(6)1-1/4“ x 41“ balusters, or (4)1-1/4 or 1-3/4“ x 41“
balusters. Each turnout requires (2)1-1/4“ x 41“ balusters or
(1)1-3/4“ x 41“ baluster. Each starting easing requires (1)
41“ baluster.
Rake Balusters* - Select the 34“ baluster for the front
baluster on each tread and the 36“ baluster for the back
baluster on each tread. If using 3 balusters per tread, use the
36“ baluster for the middle baluster on each tread.
Level Run Balusters* - Use the 36“ baluster for all 36“
height balconies and the 41“ baluster for all 41“ height
balconies. Standard placement is 4“ on center. Check local
building code for your area.
Handrail - Buy 13“ of handrail for each tread or step. Buy
enough for all level runs.
Plugs - Select two wood plugs for every newel mounting using
lag bolts. Select one plug for each handrail rail bolt used.
Handrail Mounting Hardware - Select one Rail Bolt Kit or
Spring Bolt for each handrail-to-handrail connection required.
Gooseneck Fittings - Select the appropriate gooseneck
fitting for each straight, U or L-shaped staircase newel.
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
_______
Selecting Your Parts:
2
A
B
There are several styles and options for your treads, risers, balusters and newel posts.
Below are the most common. Other items are available by special order. Check with your
store representative.
Balusters, Newel Posts:
Pin Top
Balusters
(used with solid handrail)
3503-BT
3500-BT
5015
Treads and Risers:
Tread
Riser
Landing Tread Tread
Return Nosing
Handrail, Ends and Wall Rails:
6010
Solid Handrail
7009
Returned End
7011
Quarterturn
Wall Rails Brackets:
Rosettes:
Oval Rosette
Mounting
Hardware:
Rail Bolt
Newel Attach Kits
(Oak, Poplar, Hemlock)
Starting
Newel Post
Landing
Newel Post
Use with
a Starting
Fitting at
the beginning
of a staircase.
Also use on a
level run of a
handrail
with a fitting.
Use and
Intermediate
Landing
Newel at all
landings. Each
newel must be
covered with a
fitting
C
6042
Wall Rail
Each pin top newel post must be covered with a fitting. The floor plans to the left illustrate the fitting
components needed for each landing situation.
For Wall Finishing used to
connect Handrail to Wall
Choose Starting Fitting:
7012
7012
7098 Straight
D Ea Eb F G
Make Gooseneck transition using these parts:
Choose Fitting Style:
7019
7019
7020
7020
7021
7021
7009
With Cap No Cap
Opening Cap
Opening Cap
Tandem Cap
Tandem Cap
Quarterturn
With Cap
Quarterturn
With Cap
Returned End
7011
7011
Returned End
Rail Joinery
Made Simple!
Returned End
Up-easing
Up-easing
Build a Starting Easing
Riser No Cap
Spring Bolt
Rail to Rail Kit
7035 Right
Hand Volute
7030 Left
Hand Volute
7045 Right
Hand Turnout
7040 Left
Hand Turnout
Use at the bottom of the stairway over the Starting Newel.
Volutes and Turnouts are available left hand or right hand.