Installation Guide

10
www.surewood-lnl.com © 2013 SureWood-LNL All Rights Reserved
W
OOD
~
LNL
INSTALLATION
6. See FIG 3-3. Measure and trim newel posts using guide at left.
Rake rail height (H1) should be between 36" and 42" depending on
your local building code.
Center the assembled handrail over the newel locations. Measure
distance between the tread and the bottom of the handrail fitting (A1
and A2).
Measure the thickness of the handrail (T1).
Use the following formula to calculate the starting newel height:
H1 + A1 - T1 = Starting Newel Height
7. If newel starts from the floor or a lower tread, add that distance.
8. See FIG 3-4. Trim and fasten newels using Newel Attachment Kits or Lag
Bolts and plugs, or use the Sure-Tite™ Newel Attachment Kit.
Clamp or secure handrail on top of
staircase before setting newels.
9
FIG 3-4. NEWEL POST ATTACHMENT
Newel Attachment Kit
Lag bolts
Plugs
E
F
9
CHECK LOCAL
BUILDING
CODES FOR
REQUIREMENTS
IN YOUR AREA
FIG 3-3. SETTING CORRECT RAIL HEIGHT
TIP. Cut scrap
wood to test fit
before cutting
finish material.
Above. Lag bolts and plugs
NEWEL POST AND RAIL ASSEMBLY FOR OVER-THE-POST SYSTEMS
Continued from page 9
Newel attachment kits are available for 3”
and 5” newels.
Each kit includes base trim to cover
hardware.
Sure-Tite1HZHO
$WWDFKPHQW.LW
Use the Sure-Tite
Newel Attachment kit to
securely fasten newels
to the floor system.