Owner's manual

17
95 North Oak Street • Kendallville, IN 46755 • © 2014 Star Water Systems. All rights reserved.
PUMP ELECTRICAL CONNECTIONS
Wire
from
motor
Wire from
power
supply
Ground Screws
5. Connect the green ground wire from the
power supply to the remaining green ground
screw in the pressure switch and re-attach
the pressure switch cover.
5
PUMP PRIMING AND STARTUP
CAUTION: All pumps must be primed
by lling the cavity with water before they are
rst operated. This may take several gallons
of water, as the suction line will be lled in
addition to the cavity of pump.
1. Remove priming plug or pressure gauge at
the top of the discharge tee and the vent
plug in front of the discharge tee.
Priming plug
or pressure
gauge
Vent plug
1
2. Slowly ll the discharge tee with water until
water overows the vent plug. It may be
necessary to repeat this process several
times to be sure pump and pipes are
completely lled.
NOTE: It will take several minutes to fill the
pump and all pipes completely.
Vent Plug
Opening
2