rs y 7 nt P ST y nt W a rra C SHEL L Ye a rs RE 10 Ye a Easy Grow TTM RUCTU W arra 6’ x 12’ Greenhouse Assembly Instructions Systems Trading Corporation 450 7th Avenue Suite 2809, New York, NY 10123 Customer service: 1-877-782-4482 Email: easygrow@stcaustin.
Introduction Thank you for purchasing your Easy GrowTM 6x12 Greenhouse. This model features two roof vents and a circular air vent to ensure proper ventilation. We have also included an automatic vent opener to help greenhouse will provide years of enjoyment. These instructions include helpful hints and important information needed to safely assemble and properly maintain the greenhouse. Please read these instructions completely before you begin.
Safety Advice Table of Contents level surface. Dispose of all plastic bags safely. Keep them out of the reach of small children. Keep children and pets away from the assembly area until the work is completed. Always wear shoes, gloves and safety goggles when working. In manufacturing all sharp edges and burs have been removed but caution should still be taken when handling metal parts. Do not lean against or push the greenhouse during assembly.
List of Parts ! The greenhouse is shipped in three cartons. These cartons are heavy. Be careful when lifting them. Wear proper safety gear including work shoes, gloves and goggles. Place all the parts for each step in staging areas, checking that you have all parts as you go. If any parts are missing or damaged, contact STC customer service before beginning assembly: Customer Service: 877-782-4482 or email: easygrow@stcaustin.
Twin Panel QTY QTY Door Handle Y09 4 Step 11 Y10 8 Step 11 2 2 4 2 2 S29 S30 S31 S33 S44 QTY Roof Vent Handle Y11 4 Step 11 S25 6 Step 11 Y13 2 Step 11 Y31 3 Step 2 Y32 1 Step 2 Y33 Y5 4 2 QTY S41 S41A www.stcny.
P01 P03 P04 P05 6 4 2 2 Steps 2,3 P10 2 Steps 2 P12 1 Step 2 P21 2 1 Steps 2,3,4 S08 8 Steps 3,4 S17L 2 Step 2 S17R 2 Step 2 S20 8 Step 3 S22 4 Step 8 Steps 2 Steps 2 P19 20 Steps 2 2 1 S01 Step 3 P09 P18 QTY Connector QTY Connector S37 Connector Step 2 Step 3 QTY Steps 1,2,3,4,9 S02 167 S13 6 Steps 1,8 S14 6 Steps 1,8 S24 2 Steps 7 S42 2 Step 8 S43 1 Step 12 S48 8 S52 8 Step 13 Step 2 Step 8 Anchor Clip and Peg www.stcny.
Prepare Doors Lay out all the parts for the doors in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. ! ! Both doors are identical and partially assembled at the factory. Remove protective plastic film from both sides of panels. ALL VIEWS ARE SHOWN FROM THE INSIDE. The doors are partially assembled at the factory.
Place brace G15A onto DOOR 3 lining up the holes on each end with the holes in 1.2 brace with two S52 screws and S14 hex nut. G13B S14 G13B DOOR 3 G15A S52 G13C G13A G13A IMPORTANT: The hole for hex bolt is not at the midpoint of brace. Turn brace until all holes line up. Brace will dip slightly when hex bolt is secured. Brace QTY NOTE: ALL VIEWS ARE FROM INSIDE. #G15A 2 1.3A Open door handle kit and remove parts. Slide pin S29 through handle 1.
Assemble Front and Back ! ! Lay out all the parts for the front face in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. x2 The front and back are assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE. 2.1A G06B G06A S01 S01 G02B G02A G02B G06A S01 S01 26” (660 mm) G02A 26” (660 mm) G06B 2.
2.2A Slide profiles G06C into G06A and G06B, using connectors P28. NOTE: P28 connectors do not snap into place. 2.2B Place connectors S17L and S17R on corners P28 G06C matching up bottom two holes with holes in profiles G06A, G06B and G06C as shown. P28 P28 P28 G06C S17L S17L G06B x2 S17R G06B G06A S17R G06B G06A G06A 2.2C Secure each connector with two S52 screws. 2.2D S17R S17L S52 Repeat step 2.2A through 2.2C to duplicate one more set.
2.4A Connectors P09, P10 and P18 CLICK into place. G02F P18 P18 G02E G02F x2 G02E P09 G02F Use P18 on front and P12 on back. P10 26.8” (680 mm) P09 IMPORTANT: The holes are not at midpoint of the profiles. Arrange profile so the 26.8” portion will be the bottom when standing 26.8” (680 mm) ! P10 2.4B Slide profiles G02E and G02F into connectors P09, P12 and P10 until they click into place. QTY #G02E #G02F 2.
2.6A and G02B. Continue sliding together making sure G02F G02E G02E. Connectors click Y5 P09 x2 Y33 P09 P10 P10 Y33 G02B G02A G02B G02A Connectors P09 and P10 CLICK into place. ! 2.6B Place connectors S17L and S17R on frame, lining up holes as shown. G02F G02E S17L 2.6C Secure with two S02 screws. S17R S02 S02 G06B G06A NOTE: ALL VIEWS ARE FROM INSIDE. Repeat steps 2.1 through 2.6B to complete the frame of the back of the greenhouse. Screw QTY #S02 www.stcny.
2.7 Remove protective plastic from both sides of panels Y31 and Y32. Place side to face toward the sun facing down. Slide one Y31 and one Y32 panel into V-channels on profiles G02A, G02B, G06A and G06B of the greenhouse FRONT. Fit top edges into profiles G17A and G17B. Front Back 2.7A Slide two Y31 panels into V-channels on profiles G02A, G02B, G06A and G06B of the greenhouse BACK. Fit top edges into profiles G17A and G17B.
2.8A P01 P01 G01Q G01M G01Q P01 G01N x2 P01 G01Q G01M Connectors P01 CLICK into place. IMPORTANT: Connectors P01 and P03 look very similar. P01 has built in nuts used to support door hinges installed in Step 13. MAKE SURE TO USE CONNECTOR P01 FOR THIS STEP. 2.8B G01N QTY #G01M #G01N #G01Q Connector QTY 2 2 2 #P01 4 into place. Connectors P04 and P05 CLICK into place. P04 P05 G01N G01M P04 P05 G01N G01M ! NOTE: ALL VIEWS ARE FROM INSIDE. Connector QTY #P04 www.stcny.
2.9 way into place, carefully line up P01 connectors with G06B and G06A and P04 and P05 connectors with into V-channels. Snap connectors P01, P04 and P05 securely x2 G02B G02A G06B G06A Y32 Y31 P04 P01 P01 G01M G01Q G06A G02A G01N P05 P01 P05 NOTE: ALL VIEWS ARE FROM INSIDE. G01N Repeat steps 2.8A through 2.9 to fit the bottom profiles to the back of the greenhouse. Connectors P01, P04 and P05 CLICK into place. ! www.stcny.
2.10A facing up. Slide connector to other side of channel. Use hex key to securely tighten and hold in place. NOTE: ALL VIEWS ARE FROM INSIDE. x2 G06A Y33 G06B G02A Y33 G17A G17B G02B G01N G01Q G01M 2.10B 2.10C Use hex key to securely tighten and hold in place. IMPORTANT: Make sure all corners are squared at 90 degrees. 2.11 2.10 connector to hold in place. Repeat steps 2.10A through 2.11 to attach cables to the back of the greenhouse. Hex Key QTY 1 www.stcny.
Assemble Sides Place all the parts for the sides on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. ! ! You are assembling both sides in the following steps. Both sides are identical until step 5.1 of connectors 3.1A 3.1B Slide another connector S01 so it lines S01 S01 L03A 3.1C Secure all pieces with S02 screws.
3.3 Repeat to make four sets. P39 P39 G04D Connector QTY #P39 Connector P39 CLICKS into place. 4 ! 3.4 Slide connector P03 into P03 P03 Connector P03 CLICKS into place. G04B QTY #G04B Connector 4 QTY #P03 4 into the 3.5A Att 3.5B Secure with two S02 screws. Repeat to make four sets. IMPORTANT: Connector P03 rests on top of connector S01. S02 screw secures P03 to profile G04B. G03V S01 G04B G04B G04C P03 S02 S01 G03V S02 G04C QTY NOTE: ALL VIEWS ARE FROM INSIDE. www.stcny.
3.6A 3.6B Secure with S02 screw. Repeat to connector S01 into channel of G04C. make four sets. Connector P39 CLICKS into place. P39 G03V G04B P39 G04C Screw QTY #S02 G04D 4 S02 S01 ! 3.7A Slide long side of connectors S20 3.7B Secure with three S02 screws. Repeat to make four sets. S20 S02 S20 G03V S02 S08 S08 Connector #S02 #S20 NOTE: ALL VIEWS ARE FROM INSIDE. www.stcny.
3.8A lining up holes as shown. S20 G03B 3.8B Secure with three S02 screws. Repeat to make four sets. S02 S02 G03B Connector QTY #G03B S08 QTY #S02 #S20 4 Connector 4 4 QTY #S02 #S08 8 4 3.9A 3.9B Secure with six S02 screws. Repeat to make two sets. G07C G07C G07C G03B G03V G03V G03B G07C G03V G03B G01D S02 G01D NOTE: ALL VIEWS ARE FROM INSIDE. QTY #G01D www.stcny.
3.10A 3.10B Secure with six S02 screws. Repeat to make two sets. G07D G07D G07D G03B G03V G07D G03V G03B G03V G03B G01D G01D S02 G01D QTY #G01D 3.11 QTY 2 #G07D Screw 2 QTY #S02 12 make two sets. P19 NOTE: ALL VIEWS ARE FROM INSIDE. P19 Connectors P01 and P19 CLICK into place. G03T G03T G03T P01 QTY P01 www.stcny.
3.12 Carefully slide sections together as shown. We recommend using two people for this step. Repeat to make two sets. ! G07D P19 G07C G07C G03B P19 G03V G07D P03 G03T G03V P39 G14J G03B G14J P03 G01D P39 P01 G01D Connectors P01, P03, P19 and P39 CLICK into place. G01D P01 G01D NOTE: ALL VIEWS ARE FROM INSIDE. ! NOTE: The two sides are identical. When you connect them to the back, there will be a right and left side. Stand these up. QTY #G14J www.stcny.
Prepare Shelves Place all the parts for the shelves on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. ! 4.1A connector with the hole in the channel. G14C G14C S37 S37 G14D G14D Slide connector S37 into other side, lining up last hole in connector with hole in the channel. 4.1B Secure with S02 screw.
Connect Sides to Back ! With the outside facing a wall, carefully stand back up and lean against the wall. Stand each side up and place next to the back. Both sides are identical G07A and G07B match the diagrams before connecting. 5.1A Set up one side facing inside with G07C next to the back. Slide shelf G07C G14C P03 G14C G14D G07D P03 G14D P39 P39 Connectors P03 and P39 CLICK into place. 5.1B Carefully slide left side into back, lining up connectors with profiles.
5.2A G07D connector P03 until it clicks into place. Slide clicks into place. G14D G07C G14C G14D G14C P03 P03 P39 P39 Connectors P03 and P39 CLICK into place. ! 5.2B G17D. Push side in until connectors click into place. Connector P10 CLICKS into place. P10 G07D G17D P10 S37 G07D S37 G17D S37 G14D G17D with two S02 screws. P05 S02 S02 G01D G17D VIEWS FROM INSIDE. P05 Connector P05 CLICKS into place. G01D www.stcny.
Connect Sides to Front Keep the structure as is, with the back against the wall until you ! 6.1 right side until it clicks into place. Connectors P03 CLICK into place. P03 G14D P03 G14D P03 G14C P03 Connectors P03 CLICK into place. G14C VIEWS FROM INSIDE. ! www.stcny.
6.2A P10 G07D G07C P09 G07C P05 G01D P04 G01D 6.2B click into place. P09 Connectors P09 and P10 CLICK into place. G07C G17B P10 S37 G07D S37 G14D P09 G07C P05 S37 P04 G14C G01D P04 G01D G01D Connectors P04 and P05 CLICK into place. ! www.stcny.
6.3A into connector P39. Connector P39 CLICKS into place. G14C P39 G14D G17A S37 G14C P39 6.3B Repeat step 6.3A, sliding shelf profile G14D into P39 connector. Make sure connector S37 rests on top of profile G17B. G14D P39 Connector P39 CLICKS into place. ! 6.3C with four S02 screws. G17A G14D G14D S37 G14C G17A G14C P39 S37 G17B G17B G14D G14C Screw VIEWS FROM INSIDE. QTY #S02 www.stcny.
Prepare Roof Vents Place all the parts for both roof vents and handles on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. ! ! on both sides of panels before installing. Finish assembly with the outside facing the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
Connect Gables and Roof Vents Place all the parts for the gables on a level surface. Make sure the pieces are in the correct positions before assembling. Please carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including shoes, gloves and goggles. ! Line up gable profiles with four S22 connectors as shown. Slide S22 connectors into channels of two sets of profiles G03E. Slide S22 connectors into channels of profiles G03Z.
8.3 From the inside of the greenhouse, use two people to carefully lower center gable onto frame. Line up and slide profiles G03H and G03G into connectors P19 until they click securely into place. Connectors P19 CLICK into place. G03G G03G P19 G03H P19 P19 G03H IMPORTANT: U-shaped cutouts on profiles G03H and G03G face the BACK. NOTE: One edge of profiles G03H and G03G are shaped. Stickers with arrows are placed on that edge and point DOWN when profiles are installed. G03H G03G P19 ! 8.
8.5A connector P21 at a slight angle. G02N IMPORTANT: Have the roof vents nearby. You will install the roof vent BEFORE connecting both sides of G02N. It is best to use two people for this step. P12 P21 S22 S22 rectangular holes in channels face the LEFT when looking at the front of the greenhouse from the outside. 8.5B Note: Roof vents are prepared in step 8. P12 VENT 1 G02N S22 S22 S22 VENT 1 P12 P21 G02N P21 G11A Y28 8.5C connector P12.
8.7A From inside of greenhouse secure S20 connectors to profiles G03E, G03Z, G03Y and G03J with two S02 screws. 8.7B G03Z G03E VIEWS FROM INSIDE. G02G with one S02 screw. G02H S20 S02 S20 S02 S22 S02 VIEWS FROM INSIDE. Screw QTY #S02 20 8.8A From inside of greenhouse, line up bracing profile bar S23 with holes in profiles G03T. Secure one S02 screw partially into each end. Then go back and tighten both screws. G03H 8.8B Line up bracing bar S23 with profiles G03H and G03G.
8.9A Slide two S13 hex bolts into channel of 8.9B Screw two S14 hex nuts onto bolts on ends of each S14 S13 G05D G05D G05G G05G QTY #G05D 8.10 QTY 1 #G05G Bolt / Nut QTY #S13 #S14 1 6 4 Unpack contents of Auto Vent Opener. Follow instruction manual included with Auto Vent Opener to assemble. NOTE: The Auto Vent Opener will be installed to the vent in step 8.13. Handle QTY Cylinder 1 QTY Hair Pin Clip QTY 2 2 1 1 8.
9.11C 8.11C Use the hairpin clips connected to G05D to secure the handle and prevent the vent from opening and closing in high winds. S25 G05D 8.12A With bolts on the inside of the greenhouse, slide one end of profile G05G into V-channel of profile G03H. Angle it slightly to fit the other end into V-channel of profile G03J. G03J VIEW FROM OUTSIDE. G05G G03J 8.12B Line up G05G channel with U-shaped G03H cutouts in profiles G03H and G03J.
Brace Sides Place all the parts for bracing the sides on a level surface. Make sure the pieces are in the correct positions before assembling. Please carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including shoes, gloves and goggles. ! From the inside of the greenhouse, insert long side of cable connector 9.1A other side of channel. Use hex key to securely tighten and hold in place. G07C G02B IMPORTANT: Make sure all corners are squared at 90 degrees.
9.3A G07D with hook facing the back. Slide connector to other side of channel. Use hex key to securely tighten and hold in place. G07D G07D G02A G02A G14D 9.3B Attach one side of long cable S07 to hook and lace G03T second S06 cable connector. With hook facing the G03T G01D 9.3C Push towards center square and cable is tight. Use hex key to securely tighten and hold in place. G01D G03T VIEWS FROM INSIDE. IMPORTANT: Make sure all corners are squared at 90 degrees. 9.4 G01D Repeat step 9.
Install Circular Vent ! Place all the parts for circular vent on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. 10.1A Open box containing the parts for circular vent. From the outside of the greenhouse, line up vent frame pins with holes in panel Y32, and slide into place.
Install Side and Roof Panels ! 11.1 Place all side and roof panels on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. Remove protective plastic from both sides of panels Y09 and Y10. Place side to face toward the sun facing out when installing. Slide panels carefully G03B, G03T and G03V. Fit securely into V-channels.
Install Trim Plates ! 12.1 Place the trim plates on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. Remove the six hex nuts from the hex bolts attached to each G09C and G09D trim plate BEFORE installing. G09C G09D VIEWS FROM INSIDE. 12.2A of side and roof panels.
12.4A In the front of the greenhouse, slide plastic trim plates J02L, J02R, and J03 into connectors P09, P10 and P18 until they snap into place. On top of the greenhouse, push trim plate J06 onto connector P21 and slide towards the back until it snaps into place. J06 P12 P21 J03 P18 P10 P10 J02L P09 J02R 12.4B Secure trim plate J06 to connector P21 with S43 screw. S43 J06 J06 12.
Hang Doors� ! The door has been assembled in Step 1. When hung, the bracing bar is on the inside of the greenhouse. We recommend using two people to hang the door. 13.1A Install hinges to door frame. Line up door hinge P30 with holes P30 G06A P30 P30 G06A 13.1B Secure each hinge with four S48 screws. P30 S48 Hinge QTY #P30 www.stcny.
13.2A Place S49 pin in bottom door hinge S49 G06A P30 13.2B From the outside of the greenhouse, carefully line up hinge on bottom of DOOR 3 with S49 pin on door frame. Lower door onto pin until hinges meet. Push top door back towards door frame so top hinges line up. S49 13.2C Line up top door hinge with top door frame hinge. From bottom of hinges, slide S51 pin through both hinges. 13.2D Secure pin in place with S50 lock washer as shown. S51 S50 S51 Pin Repeat steps 13.1A and 13.
Secure to Ground ! 14 Make sure the foundation is FLAT and LEVEL. Make sure the greenhouse is square. The two diagonal measurements inside the greenhouse should be identical. From the inside of the greenhouse, insert the S34 anchor clips sides. Place the S35 pegs through the holes and into the ground to establish proper the concrete is partially dry, use a hammer to drive the pegs all the way into the concrete and let dry completely for twenty four hours.
Install Trays ! 15.1 Place all the parts for the trays and bin holder on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. From the inside of the greenhouse, place the trays on the shelves. The trays interlock together and rest on the Trays QTY #J05 www.stcny.
Notes:
Easy Grow TM 6’ x 12’ Greenhouse Assembly Instructions Please keep this manual in a safe place for reference, service and warranty. If you need any help or have missing or damaged parts, please contact us. Visit www.ecomposter.net for composting solutions. Ecomposter Sphere, Standard Base and Optional Base Systems Trading Corporation 450 7th Avenue Suite 2809, New York, NY 10123 Service clientèle: 1-877-782-4482 Email: easygrow@stcaustin.