rs y 7 nt P ST y nt W a rra C SHEL L Ye a rs RE 10 Ye a Clear View TM RUCTU W arra 8’ x 12’ Greenhouse Assembly Instructions Systems Trading Corporation 450 7th Avenue Suite 2809, New York, NY 10123 Customer Service: (877) 407-9100 ext 1 Email: customerservice@stcaustin.
Introduction Thank you for purchasing your Clear ViewTM 8x12 Greenhouse. This model features two roof vents and a circular air vent to ensure proper ventilation. We have also included an automatic vent opener to help greenhouse will provide years of enjoyment. These instructions include helpful hints and important information needed to safely assemble and properly maintain the greenhouse. Please read these instructions completely before you begin.
Safety Advice Table of Contents level surface. Dispose of all plastic bags safely. Keep them out of the reach of small children. Keep children and pets away from the assembly area until the work is completed. Always wear shoes, gloves and safety goggles when working. In manufacturing all sharp edges and burs have been removed but caution should still be taken when handling metal parts. Do not lean against or push the greenhouse during assembly.
List of Parts ! The greenhouse is shipped in three cartons. These cartons are heavy. Be careful when lifting them. Wear proper safety gear including work shoes, gloves and goggles. Place all the parts for each step in staging areas, checking that you have all parts as you go. If any parts are missing or damaged, contact STC customer service before beginning assembly: Customer Service: (877) 407-9100 ext. 1 or email: customerservice@stcaustin.
Clear Panel QTY 1 Step 3 GY12 4 Step 12 GY2 2 Step 1 GY13 8 Step 12 GY5 1 Step 3 GY16 1 Step 1 GY6 1 Step 3 GY17 1 Step 1 GY7 1 Step 1 GY18 1 Step 3 GY8 1 Step 1 GY19 1 Step 3 GY9 1 Step 1 GY20 2 Step 1 GY21 2 Step 1 QTY #P30 #S49 #S50 #S51 Door Handle S29 S30 S31 S33 S44 Door Lock S40 S40A Roof Vent Handle S25 4 2 2 2 Step 14 Step 14 Step 14 Step 14 Twin Panel QTY 1 Step 2 1 Step 2 2 Step 2 1 Step 2 1 Step 2 QTY 2 Step 2 4 Step 2 QTY 1 S41 S41A 1 2 QTY circular
P01 4 Steps 3,4 P03 4 Step 4 P04 P05 2 2 QTY Connector QTY Connector S01 20 Steps 1,3,4 S08 12 Steps 2,3,4 S08C 1 Step 3 S11 4 Step 1,3 S17L 1 Step 3 S17R 1 Step 3 Steps 1,3 Steps 1,3 P09 2 Steps 1,3 P10 2 Steps 1,3 S20 8 Step 4 P12 1 Step 1 S22 4 Step 9 P18 1 Step 3 S37 12 Steps 5,15 G16A 2 P19 2 Step 4 Connector P21 P28 P39 2 4 Step 9 Step 3 Step 4 QTY Trim Plate G09C G09D J02L J02R J03 J06 www.stcny.
Assemble Back Place all the parts for the back face on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. ! ! The back is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE. 1.1A 1.1B Secure with S02 screws. G02B G02A S01 26” (660mm) 1.
Assemble Back Place all the parts for the back face on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. ! ! The back is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE. 1.1A 1.1B Secure with S02 screws. G02B G02A S01 26” (660mm) 1.
1.3A channels lining up last hole of S01 with holes in G17D. G03C G02B G03D G17C G02A G17D 1.3B Secure with four S02 screws. G03C G03D G02B G02A G17C G17D NOTE: ALL VIEWS ARE FROM INSIDE. QTY #G17C #G17D www.stcny.
1.4A 1.4B G03L Secure with four S02 screws. S02 G03L S02 G03K Connector QTY G16A #G03K #G03L 1.5A 1 1 QTY #G16A #S02 1 4 Slide connectors S08 into channels 1.5B Secure each connector with two S02 screws. G03K S02 G03L G02B S08 G03C G03D G02A G03K S08 S08 S08 QTY #S02 #S08 NOTE: ALL VIEWS ARE FROM INSIDE www.stcny.
1.6A 1.6B Line up the outside holes on G16A with second S02 screws. G01I G01I G16A G01J G01J NOTE: ALL VIEWS ARE FROM INSIDE QTY #G01I #G01J Connector 1 1 QTY #G16A #S02 1 2 1.6C click into place. Connectors P04 and P05 CLICK into place. P04 P05 G01I G01J G01J P04 P05 G01I ! Connector QTY #P04 www.stcny.
1.7 Remove protective plastic from both sides of panels GY2 . The clear panels are designed with window shapes that curve outward. Place the outward curved side G03L G02B, G03C, G03D, G17C and G17D. G02B G03C G17D G03K G03D G02A GY2 ! Remove protective plastic from EACH side of clear panels before installing. Dispose of plastic properly. Install with outward curved side FACING DOWN. Clear Panel QTY #GY2 GY2 2 1.8A ! G03L NOTE: ALL VIEWS ARE FROM INSIDE.
1.9A 1.9B S13 Screw hex nut S14 onto bolt. Do not completely tighten. G05H G05H S14 G05H G05H QTY #G05H 1.10A Bolt/Nut QTY #S13 #S14 4 6 6 Remove protective plastic from both sides of panels GY20 and GY21. The clear panels are designed with window shapes that curve outward. Place the outward curved side facing down. ! securely into the V-channels. Remove protective plastic from EACH side of clear panels before installing. Dispose of plastic properly.
Remove protective plastic from both sides of panels GY7, GY8, GY16 and GY17. The clear panels are designed with window shapes that curve outward. Place the outward curved side facing down. 1.10C the V-channels. GY17 ! GY16 Remove protective plastic from EACH side of clear panels before installing. Dispose of plastic properly. Install with outward curved side FACING DOWN. 1.10D GY7 G03L G05H G05H Slide hex nut S14 and hex bolts S13 G03C, G03D, G03L and G03K. Tighten securely to hold in place.
1.11B P09 and P10 G02I row of ribbed edges on panels GY7, and G02J. Connectors click G02J GY17 P09 GY16 P10 GY7 G02I GY8 G02J P09 P10 G02B Connectors P09 and P10 CLICK into place. ! G02A 1.12A G02I and G03C, G02J and G03L and G02J and G03D matching up all holes. G02J G03L G03C S11 G03D 1.12B Screw S02 screws partially into bottom two holes. Do not tighten. 1.12C S02 Screw S02 screws into top two holes. Tighten all screws. Repeat for both sides.
1.13A Insert long side of cable connector S06 at an angle UP. Slide connector to other side of channel. Use hex key to securely tighten and hold in place. G02B G17C G17D G02A G01I 1.13B G01J Attach one side of short cable S16 to hook on S06 second S06 cable connector and with hook facing center, insert into square and cable is tight. Use hex key to securely tighten and hold in place. IMPORTANT: Make sure all corners are squared at 90 degrees. G03C NOTE: ALL VIEWS ARE FROM INSIDE. G01I 1.
Prepare Doors Place all the parts for both doors on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. ! ! installing. Finish assembly with the outside facing the ground. ALL VIEWS ARE SHOWN FROM INSIDE. 2.1A Remove protective plastic from both sides of panels on DOOR 1G. Place side to face the sun facing down. ! 2.
Place brace G15D onto DOOR 1G lining up the holes on each end with the holes 2.2 Secure brace with two S52 screws and S14 hex nut. G13B G13E S14 G13B DOOR 1G G15D S52 G13C G13C G13E G13E IMPORTANT: The hole for hex bolt is not at the midpoint of brace. Turn brace until all holes line up. Brace will dip slightly when hex bolt is secured. Brace QTY NOTE: ALL VIEWS ARE FROM INSIDE. 2.3A #G15D 1 Open door handle kit and remove parts. Slide pin S29 through handle S30 S29 2.3B S31 S31 G13C 2.
2.4A Remove protective plastic from both sides of panels on DOOR 2G. Place side to face the sun facing down. DOOR 2G ! Remove protective plastic from EACH side of clear panels before installing. Dispose of plastic properly. Install with outward curved side FACING DOWN. 2.4B Remove S52 screws and S14 nut as shown. S14 S52 DOOR 2G G13D G13H S52 G13D G13H 2.4B Place brace G15D onto DOOR 2G lining up the holes on each end with brace. Secure brace with two S52 screws and S14 hex nut.
2.5A Door 2G shown. Center the levers so the screw holes are visible. S40 G13G S40 G13G S40 G13D DOOR 2G S40 IMPORTANT: Install door locks so levers face the panels. 2.5B Secure each S40 lock with two S40A screws. S40A S40A G13G 2.5C G13D G13D Move lever to the right side to place lock in the unlocked position. G13D G13G NOTE: Door locks are shown in the UNLOCKED position. When door is installed in step 14 and door is closed, move lever to the left side to lock door.
Assemble Front Place all the parts for the front face on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. ! ! The front is assembled with the outside face to the ground. ALL VIEWS ARE SHOWN FROM INSIDE. 3.1A G02B, G06A and G06K. G06K S01 S01 G02A G02B G02A G06A S01 S01 G02B 3.
3.2A connectors do not snap into place. G06J P28 P28 P28 G06K G06A, G06J and G06K as shown. S17L Secure each connector with S52 screws. S17R S17L S17R Place connectors S17L and S17R on corners matching up bottom 3.2B 3.2C G06J S17L G06A G06K G06A S17R G06K G06A S52 QTY #G06J Connector 1 QTY #P28 #S17L #S52 2 #S17R #S52 2 2 3.3A 3.3B Secure with S02 screws. G17A, lining up last hole of S01 with holes in G17A.
3.4A Slide connector S08 into 3.4C G03W G03W G03W 3.4B Secure with two S02 screws. G06J G06J G06K G06A S02 S08 3.4D Secure with two S02 screws. S08 S02 QTY NOTE: ALL VIEWS ARE FROM INSIDE. Connector QTY #S02 #S08 #G03W 1 4 1 3.5 P18 Connectors P09, P10 and P18 CLICK into place. P18 G02K G02K G02L G02L P09 G02L G02K P10 26.8” (680 mm) 26.8” (680 mm) P09 P10 ! QTY #G02K #G02L www.stcny.
3.6 3.6 Remove protective plastic from both sides of panels GY5, GY6, GY18 and GY19. The clear panels are designed with window shapes that curve outward. GY5 Place the outward curved side facing GY19 GY18 G03W GY6 G06J G02B G06K G06A G17B G02A G17A ! Remove protective plastic from EACH side of clear panels before installing. Dispose of plastic properly. Install with outward curved side FACING DOWN. Clear Panel 3.
Loosen the four screws in connectors S17L and S17R enough to adjust door 3.7B S11 G02L with two S02 screws and tighten four screws G02K S17R S17L G02L G02K G06J S02 G06A G06K S02 S17R S17L 3.7C 3.7E and G03W, lining up all holes. G06K S11 3.7D Screw S02 screws into top two holes. Tighten all screws. Screw S02 screws partially into bottom two holes. Do not tighten. S02 G03W Connector ALL VIEWS FROM INSIDE. QTY #S02 #S11 S02 6 1 tightening connectors S17L and S17R with S02 screws.
3.8B Line up connector S08C with holes on 3.8C Secure with two S02 screws. S02 S08C G01O G01O 3.9A until they securely click into place. G01M P01 P01 G01O G01N G01O P01 G01O P01 G01M IMPORTANT: Connectors P01 and P03 look very similar. P01 has built in nuts used to support door hinges installed in Step 14. MAKE SURE TO USE CONNECTOR P01 FOR THIS STEP. QTY #G01M #G01N #G01O 3.9B G01N Connectors P01 CLICK into place.
3.10 As you slide bottom profiles G01M, G01O and G01N half way into place, carefully line up P01 connectors with channels on profiles G06K and G06A and P04 connectors with profiles G02B and G02A. Continue sliding, making sure panels GY1 and GY9 fit into V-channels. Snap connectors P01, P04 and P05 securely into profiles. G02B Y32 GY9 G02A G06A G06K GY1 P04 P01 P01 G01M P05 G01O G01N G06A G02A NOTE: ALL VIEWS ARE FROM INSIDE. P01 P05 Connectors P01, P04 and P05 CLICK into place. ! www.stcny.
3.11A Insert long side of cable connector S06 at an FACING UP. Slide connector to other side of channel. Use hex key to securely tighten and hold in place. G06A G02A G06K G02B G01O NOTE: ALL VIEWS ARE FROM INSIDE. G01M 3.11B Use hex key to securely tighten and hold in place. IMPORTANT: Make sure all corners are squared at 90 degrees. G06K G01M 3.12 Repeat step 3.11 inserting cable G06A corners are square and cable is tight. Use hex key to securely tighten second connector and hold in place.
Assemble Sides ! ! Place all the parts for the sides on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. You are assembling both sides in the following steps. Both sides are identical until step 6.1 4.1A of connectors 4.1B S01 Slide another connector S01 so it lines S01 L03A 4.1C Secure all pieces with S02 screws.
4.3 Repeat to make four sets. P39 P39 G04D Connector QTY #P39 Connector P39 CLICKS into place. 4 ! 4.4 Slide connector P03 into P03 P03 Connector P03 CLICKS into place. G04B QTY #G04B 4.5A Connector 4 QTY #P03 Att 4 into the 4.5B Secure with two S02 screws. Repeat to make four sets. IMPORTANT: Connector P03 rests on top of connector G03V S01 G04B G04B G04C P03 S02 S01 G03V S02 G04C QTY NOTE: ALL VIEWS ARE FROM INSIDE. www.stcny.
4.6A 4.6B connector S01 into channel of G04C. Secure with S02 screw. Repeat to make four sets. Connector P39 CLICKS into place. P39 G03V G04B P39 G04C Screw QTY #S02 G04D 4 S02 S01 ! 4.7A Slide long side of connectors S20 4.7B Secure with three S02 screws. Repeat to make four sets. S20 S02 S20 G03V S08 S08 S02 Connector #S02 #S20 NOTE: ALL VIEWS ARE FROM INSIDE. www.stcny.
4.8A lining up holes as shown. S20 G03B 4.8B Secure with three S02 screws. Repeat to make four sets. S02 S02 G03B Connector QTY #G03B S08 QTY #S02 #S20 4 Connector 4 4 QTY #S02 #S08 8 4 4.9A 4.9B Secure with six S02 screws. Repeat to make two sets. G07C G07C G07C G03B G03V G03V G03B G07C G03V G03B G01D S02 G01D NOTE: ALL VIEWS ARE FROM INSIDE. QTY #G01D www.stcny.
4.10A Secure with six S02 screws. Repeat to make two sets. 4.10B G07D G07D G07D G03B G03V G07D G03V G03B G03V G03B G01D G01D S02 G01D QTY #G01D 4.11 QTY 2 #G07D Screw 2 QTY #S02 12 make two sets. P19 NOTE: ALL VIEWS ARE FROM INSIDE. P19 Connectors P01 and P19 CLICK into place. G03T G03T G03T P01 QTY P01 www.stcny.
4.12 Carefully slide sections together as shown. We recommend using two people for this step. Repeat to make two sets. ! G07D P19 G07C G07C G03B P19 G03V G07D P03 G03T G03V P39 G14J G03B G14J P03 G01D P39 P01 G01D Connectors P01, P03, P19 and P39 CLICK into place. G01D P01 G01D NOTE: ALL VIEWS ARE FROM INSIDE. ! NOTE: The two sides are identical. When you connect them to the back, there will be a right and left side. Stand these up. QTY #G14J www.stcny.
Prepare Shelves ! Place all the parts for the shelves on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. 5.1A connector with the hole in the channel. G14C G14C S37 S37 G14D G14D Slide connector S37 into other side, lining up last hole in connector with hole in the channel. 5.1B Secure with S02 screw.
Connect Sides to Back With the outside facing a wall, carefully stand back up and lean against the wall. Stand each side up and place next to the back. Both sides are identical ! G07A and G07B match the diagrams before connecting. 6.1A Set up one side facing inside with G07C next to the back. Slide shelf G07C G14C P03 G14C G14D G07D P03 G14D P39 P39 Connectors P03 and P39 CLICK into place. 6.
6.2A G07D connector P03 until it clicks into place. Slide clicks into place. G14D G14D G07C G14C G14C P03 P03 P39 P39 Connectors P03 and P39 CLICK into place. ! 6.2B G17D. Push side in until connectors click into place. Connector P10 CLICKS into place. P10 G07D P10 G17D S37 G07D S37 G17D G14D G14C G17D with two S02 screws. P05 S02 S02 G01D G17D VIEWS FROM INSIDE. P05 Connector P05 CLICKS into place. G01D www.stcny.
Connect Sides to Front ! Keep the structure as is, with the back against the wall until you 7.1 right side until it clicks into place. Connectors P03 CLICK into place. P03 G14D G07D P03 G14D G07C P03 G14C P03 Connectors P03 CLICK into place. G14C VIEWS FROM INSIDE. ! www.stcny.
7.2A P10 G07D G14D P09 P05 G07C G01D P04 G01D 7.2B click into place. P09 Connectors P09 and P10 CLICK into place. G07C G17B P10 G07D S37 S37 G14D P09 G07C P05 S37 P04 G14C G01D P04 G01D G01D Connectors P04 and P05 CLICK into place. ! www.stcny.
7.3A into connector P39. Connector P39 CLICKS into place. G14C P39 G07D S37 G17A G14D G14C P39 7.3B P39 connector. Make sure connector S37 rests on top G14D P39 Connector P39 CLICKS into place. ! 7.3C with four S02 screws. G17A G14D G14C G17B G14D G14C Screw VIEWS FROM INSIDE. QTY #S02 www.stcny.
Prepare Roof Vents Place all the parts for both roof vents and handles on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. ! ! on both sides of panels before installing. Finish assembly with the outside facing the ground. ALL VIEWS ARE SHOWN FROM INSIDE.
Connect Gables and Roof Vents Place all the parts for the gables on a level surface. Make sure the pieces are in the correct positions before assembling. Please carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including shoes, gloves and goggles. ! 9.1A G03R G03S G03M Secure each set with four S02 screws. 9.1B S22 S22 S22 G03M S22 S02 G03R G03S G03M S22 G03M G03R and G03S. Attach shorter side (26.5”) to connector S22.
From the inside of the greenhouse, use two people to carefully lower center gable onto frame. 9.3 Connectors P19 CLICK into place. G03N G03N G03Q P19 P19 P19 G03Q IMPORTANT: U-shaped cutouts on G03Q G03N shaped. Stickers with arrows are placed on that P19 ! From the inside of the greenhouse, use two people to carefully lower front and back gables onto 9.
9.5A connector P21 at a slight angle. G02N IMPORTANT: Have the roof vents nearby. You will install the roof vent BEFORE connecting both sides of G02N. It is best to use two people for this step. P12 P21 S22 S22 rectangular holes in channels face the LEFT when looking at the front of the greenhouse from the outside. 9.5B Note: Roof vents are prepared in step 8. P12 VENT G02N P12 S22 S22 P21 G02N VENT S22 P21 G11A VENT 9.5C connector P12. Make sure both connectors snap securely into place.
From inside of greenhouse secure S20 connectors 9.7A 9.7B Secure each S22 connector to G03U with two S02 screws. G02H G03S S22 S20 S02 S02 G03R VIEWS FROM INSIDE. Screw QTY #S02 S20 20 S02 VIEWS FROM INSIDE. From inside of greenhouse, line up bracing bar 9.8A G03S. Secure one S02 screw partially into each end. Then go back and tighten both screws. G03U G03U G03R G03S S23 S23 S02 S02 S02 S02 VIEWS FROM INSIDE. 9.
9.9A Slide two S13 hex bolts into channel of 9.9B Screw two S14 hex nuts onto bolts on ends of each S14 S13 G05D G05D G05G G05G QTY #G05D 9.10 QTY 1 #G05G Bolt / Nut QTY #S13 #S14 1 6 4 Unpack contents of Auto Vent Opener. Follow instruction manual included with Auto Vent Opener to assemble. NOTE: The Auto Vent Opener will be installed to the vent in step 9.13. Handle QTY Cylinder QTY Hair Pin Clip 1 9.
9.11C Use the hairpin clips connected to G05D to secure the handle and prevent the vent from opening and closing in high winds. S25 G05D 9.12A G03S VIEW FROM OUTSIDE. G05G G03S G03N G05G 9.12B Line up G05G channel with U-shaped Slide hex nut and bolts into U-shaped notches and tighten securely. G03S G05N G05G 9.13A G03S G05G G05G G03S VIEWS FROM INSIDE. From the inside of the greenhouse open arms of auto vent slightly. Line up window G10A arm B S41A G10A 9.13B Secure with two S14 hex nuts.
Brace Sides Place all the parts for bracing the sides on a level surface. Make sure the pieces are in the correct positions before assembling. Please carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including shoes, gloves and goggles. ! 10.1A From the inside of the greenhouse, insert long side of cable connector other side of channel. Use hex key to securely tighten and hold in place. G07C G02B IMPORTANT: Make sure all corners are squared at 90 degrees.
10.3A G07D with hook facing the back. Slide connector to other side of channel. Use hex key to securely tighten and hold in place. G07D G02A G02A G07D G14D 10.3B Attach one side of long cable S07 to hook and lace second S06 cable connector. With hook facing the G03T G01D G03T 10.3C Push towards center square and cable is tight. Use hex key to securely tighten and hold in place. G01D G03T VIEWS FROM INSIDE. IMPORTANT: Make sure all corners are squared at 90 degrees. G01D G07D 10.
Install Circular Vent Place all the parts for circular vent on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. ! 11.1A Open box containing the parts for circular vent. From the outside of the greenhouse, line up vent frame pins with holes in panel GY9, and slide into place.
Install Side and Roof Panels ! 12.1 Place all side and roof panels on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. Remove protective plastic from both sides of panels GY12 and GY13. The clear panels are designed with window shapes that curve outward. GY13 Place the outward curved side facing out when installing.
Install Trim Plates ! 13.1 Place the trim plates on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. Remove the six hex nuts from the hex bolts attached to each G09C and G09D trim plate BEFORE installing. G09C G09D VIEWS FROM INSIDE. 13.2A of side and roof panels.
13.4A In the front of the greenhouse, slide plastic trim plates J02L, J02R, and J03 into connectors P09, P10 and P18 until they snap into place. On top of the greenhouse, snap trim plate J06 onto connector P21 and slide towards the back until it snaps into place. J06 P12 P21 P18 J03 P10 P10 J02L P09 J02R 13.4B Secure trim plate J06 to connector P21 with S43 screw. S43 J06 13.
Hang Doors ! 14.1A The doors have been assembled in Step 2. When hung, the bracing bars and door locks are on the inside of the doors in the greenhouse. We recommend using two people to hang the doors. Install hinges to door frame. Line up door hinge P30 with holes P30 G06A P30 P30 G06A G06K P30 P30 G06A 14.1B Secure each hinge with four S48 screws. P30 S48 Hinge QTY #P30 www.stcny.
14.2A Place S49 pin in bottom door hinges S49 G06K on both sides of door frame. S49 G06K G06A 14.2B From the outside of the greenhouse, carefully line up hinge on bottom of DOOR 1G with S49 pin on right side of door frame. Lower door frame onto pin until hinges meet. Push top door back towards door frame so top hinges line up. S49 14.2C Line up top door hinge with top door frame hinge. From bottom of hinges, slide S51 pin through both hinges. 14.
14.3A From the outside of the greenhouse, carefully line up hinge on bottom of DOOR 2G with S49 pin on left side of door frame. Lower door frame onto pin until hinges meet. Push top door back towards door frame so top hinges line up. S49 14.3B Line up top door hinge with top door frame hinge. From bottom of hinges, slide S51 pin through both hinges. S51 14.3C Secure pin in place with S50 lock washer as shown. S51 S50 Lock Washer/Pin #S50 #S51 www.stcny.
Secure to Ground ! 15 Make sure the foundation is FLAT and LEVEL. Make sure the greenhouse is square. The two diagonal measurements inside the greenhouse should be identical. From the inside of the greenhouse, insert the S34 anchor clips sides. Place the S35 pegs through the holes and into the ground to establish proper the concrete is partially dry, use a hammer to drive the pegs all the way into the concrete and let dry completely for twenty four hours.
Install Trays and Bin Holder ! 16.1 16.2A Place all the parts for the trays and bin holder on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. From the inside of the greenhouse, place the trays on the shelves.
Notes:
Clear View TM 8’ x 12’ Greenhouse Assembly Instructions Please keep this manual in a safe place for reference, service and warranty. If you need any help or have missing or damaged parts, please contact us. Visit www.ecomposter.net for composting solutions. Ecomposter Sphere, Standard Base and Optional Base Systems Trading Corporation 450 7th Avenue Suite 2809, New York, NY 10123 Customer Service: (877) 407-9100 ext 1 Email: customerservice@stcaustin.