Use and Care Manual
QTY
#S02
#S36
4
4
Screw
QTY
#S37 4
Connector
QTY
#G04G 2
Install Trays and Bin Holder
From the inside of the greenhouse, place the trays on the
shelves. The trays interlock together and rest on the
Slide long side of
connector S37 into
G04G, lining up the
last hole on the
connector with the
hole in the channel.
QTY
#J05
Trays
30
!
Place all the parts for the trays and bin holder on a level surface.
Make sure the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
16.1
16.2A
16.3A
S36
S37
S02
Secure each S37 connector
with one S02 screw.
Secure each connector with
one S36 screw.
16.3B
16.2B
IMPORTANT: S36 are self tapping screws used to screw into areas that do not have predrilled holes. When you
NOTE: A cordless drill with a phillips head bit is recommended.
56 of 56
www.stcny.com
G04G
G04G