Instructions / Assembly

- 9 -
Attention: Keep the steam engine clean.
Attention: To avoid damage to the equipment, do not connect strong electrical current directly to the components.
IMPORTANT: Each unit shall be provided with a pressure-release device to address overpressure due to inadvertent blockage of the output
steam head or piping. If factory installed, it shall be provided with no more than 6 inches (150mm) of piping between the device and the
generator tank. If shipped with the steam generator, the installation instructions shall indicate it shall be installed to the generator tank with no
more than 6 inches (150 mm) of piping.