Installation Guide

4 | P a g e
Rev 01.2019
ASSEMBLY INSTRUCTIONS:
1. Make sure there is enough space to set the base in place (32 X 60) and 85 in for height.
2. Determine which direction of the unit is appropriate I.E. left or right. The 5in elevated platform of the
base is where the wet wall will be.
3. Connect the shower base drain to the base and set the base in place using Thinset or some other
support material to level the base and support it.
4. Place the foam tape in the channel of the base to support the glass panels. Make sure the weep holes
in the base are free and clear so that any water getting
to the outside can drain back into the shower.
Note a bottle of Windex comes in handy at this time.
Use it freely when attaching any of the gaskets.
5. Set the large back panel (B) in the back channel of the base, attach one corner gasket on each side.
6. Next slide the non-control panel (C) into the corner gasket on the opposite side of
the wet wall will be.
7. Secure with bolts and angle brackets. Make sure as you are assembling the unit,
all the glass panels are plumb and at 90-degree angles to each other.