Installation Guide
2.  Connect the steam generator according to the drawing. 
a.  Water inlet: G1/2 thread connector. 
b.  Drain: G1/2 thread connector. Must be copper for at least first 3ft from the generator. 
c.  Steam outlet: G3/4 thread connector 
d.  Steam line: Must use copper. Insulate the line with high temp 212 plus temp rating insulation. 
e.  Install a brass union on the steam line for easy disassembly. 










