Installation Instructions
4 | P a g e
Rev 02/2015
NOTICE TO INSTALLERS
1) The distance from the ground to the ceiling has to be minimum of 3.9” higher than the height of the steam room.
2) The water pressure has to be more than 3kg/cm2 (47-72 psi) and, if the pressure is lower than required, you
may install a booster to the water supply.
3) Please use a 20-amp 220V GFI breaker for the electrical connection.
4) We advised to have an access panel installed on the side of the electrical/water connections for maintenance
and service.
5) In the parts box is a roll of a foam type tape with one side that has an adhesive on it. This should be placed in
the bottom channels of the base where the glass panels rest.
Manufacturer reserves the right to change specs or features at anytime. Please check to confirm details. 1-866-783-2661
PACKING NOTE:
(1) When first opening the boxes, please make sure everything is in good condition, especially if any visible damage has
been done to the package, please contact Steam Planet immediately with photographic documentation of the damage.
(2) Make sure all water and electrical components are up to local and national standards.
(3)Two installers are required for these units.
(4) Here are the tools you may need for installation:
Rubber mallet wrench level tape measure screwdriver pencil 4mm allen wrench