Installation Guide

4 | Page
MANDATORY READING
INSTALLATION UPDATE BULLETIN
INSTALLATION OF 9KW AND 12KW STEAM GENERATORS
When connecting the power supply for the 9KW and 12KW steam generators, there may be some difficulty connecting the 8 and 6-
gauge wires into the terminal block. In order to make these connections as easy as possible, you can remove steam generators wires
from the terminal block and wire nut the wires directly to your power source. This will make the electrical connections easier.
USING THE TERMINAL BLOCK
When using the connection terminal block, the connection can become loose due to expansion and contraction from the heat and the
small vibrations caused when the unit is running. After the initial installation the connection must be checked after 30 days to
make sure the connection is still tight (tighten if necessary), then the connection should be checked about every 6 months
after that.
If desired, connections may be made directly not using the terminal block. Follow the instructions above for the 9kW and 12kW steam
generators.
Terminal block connected Terminal block by-passed using wire nuts
INSTALLATION OF THE KEYPAD EXTENSION WIRE
When connecting the keypad and/ or the keypad extension wire to the Steam Generator cable, DO NOT TWIST THE PLUGS. They are
to be PUSHED together, twisting will damage the pins and it is not covered under the warranty.
The Temperature detector foundation and locknut for temperature detector foundation (escutcheon) for the temperature
sensor, comes in a bag inside of the keypad box. Also included is the Steam Head.
Light kits are available for the GS08 Steam Generators. White light and chromotherapy lights are available. Contact your place of
purchase.