STEAM BATH GENERATOR USER GUIDE BLACK SERIES MODELS AUTO D HI S PER QUI ET RA IN T -IN W TI N T UOUS S T BUI L CON Q UI C K S TAR EA M 4.5KW 6KW 7.5KW 9KW 10.5KW 12KW DON’T WAIT! REGISTER NOW! Register your product within 90 days to ensure your steam bath warranty coverage. Mail in the completed registry card (Pg. 2) or regis ter online at www.SteamSpa.com/register. Steam Spa PHONE: 800-856-0172 FAX: 866-560-1060 http://steamspa.com info@steamspa.com V3.
PRODUCT REGISTRATION* IMPORTANT: Your warranty will not be recognized unless this card is fully completed and returned or online registration is completed. To ensure that your warranty is registered and confirmed please do one of the following: 1. Register online at www.SteamSpa.com/register. You will be asked to fill out the same information you would in the registration card. Registering online is fast, secure and ensures we receive your information. 2.
IMPORTANT WARRANTY INFORMATION! The installation of a quick connect and release system is essential to the care and maintenance of your steam bath generator unit. Additionally, the use of an inline water filter with fresh cartridges prevents mineral deposit and built up from damaging the generator’s internal plumbing and compnents. 1. The User must register product within 90 days of delivery. See www.SteamSpa.com/register. 2. Installation must be performed by a licensed professional. 3.
This peel-n-stick warning label must be applied to the wall of the shower or steam enclosure, at a point visible to all users. Failure to install sticker may result in serious injury or death. For replacement label contact SteamSpa at 1-800-856-0172 or info@steamspa.com. Steam Spa PHONE: 800-856-0172 FAX: 866-560-1060 http://steamspa.com info@steamspa.
TABLE OF CONTENTS PROLOGUE........................................................................................................................6 USER INSTRUCTIONS..........................................................................................................6 CHOOSING THE RIGHT LOCATION...........................................................................................6 INSTALLATION DRAWING OF STEAM GENERATOR......................................................................
PROLOGUE Thank You for choosing SteamSpa for health, beauty and relaxation. Now you can enjoy your own private sanctuary in the comfort of your own home. Let your stress melt away as you relax in your state of the art Steam Room. WARRANTY SteamSpa warrants that this steam bath generator unit will be free from manufacturer defects and malfunctions. For terms and condition please refer to latest SteamSpa Warranty at www.SteamSpa.com/warranty.
INSTALLATION & USER GUIDE INSTALLATION DRAWING OF STEAM GENERATOR ATTENTION! The drawing is only for explanation purposes. As for practical design of steam room, please consult with a qualified designer, architect or builder. Page 7 SteamSpa PHONE: 800-856-0172 FAX: 866-560-1060 http://steamspa.com info@steamspa.
INSTALLATION & USER GUIDE ATTENTION! The drawing is only for explanation purposes, please consult with a qualified designer, architect or builder. IMPORTANT! All pipe connections should have unions and adapters for easy disconnect. ATTENTION! Proper installation is a critical requirement per the SteamSpa Warranty terms and conditions. A licensed professional must be used to ensure proper installation. A quick release system, pressure reducing valve, inline water filter and regular maintenance are required.
ATTENTION! The illustration is just an example; the practical installation must comply with the nation’s electrical criteria, and be done by a professional electrician. The steam generator maybe installed in these location. 1. In closet located behind the shower. 2. In Attic 3. In basement etc. ATTENTION! If the installation of the steam generator will be more then 10 to 15 feet away from the steam room.
PLUMBING INSTALLATION WARNING! The installation of all water supply lines should be in accordance to all national and local codes by a licensed plumber. 1. Use unions when connecting pipes. 2. Use brass pipes or copper pipe only. 3. Do not use black and galvanized or PVC pipes. ATTENTION! Please ensure a quick connect and release system in employed when installing steam generator to plumbing.
STEAM HEAD (3/4’’) ATTENTION! Steam Head and the steam outlet gets very hot, try to avoid installing the steam head in a position which will easily come into contact with the person bathing. 1. Install the steam head approximately 12 inches above the ground floor. If the steam room material is acrylic or non-heatresistant sheet, please consult with material manufacturer about steam room applications. 2. The steam head outlet should be installed face down. To prevent scalding bather with steam or water.
STEAM GENERATOR SPECIFICATIONS 395mm 304mm 142mm 43mm 302mm 266mm Safety valve Water inlet 32mm 188mm 151mm 206mm Steam outlet Water drainage 62mm 72mm Fuse for wire power supply C o n tr o lle r w ir e and light wire hole Power wire hole INSTALLATION & USER GUIDE Fuse for wire power supply 4.
535mm 435mm 234mm Steam outlet 34mm 35 0mm 273mm 183mm Water inlet 38 5mm Safety valve Water drainage Fuse for wire power supply Controller wire and light wire hole Power wire hole 10.5kW/12kW/15kW ATTENTION! To facilitate maintenance, keep the steam engine clean. If the information provided is limited, do not operate on the pipeline and electric equipment arbitrarily as shown in the figure for proportion. ELECTRICAL REQUIREMENTS ELECTRICAL SUPPLY CIRCUITRY 1.
Ty p e P owe r KW El e c t ri c i t y s upply (1PH) Ele c tr ic current (A) Specifications for power wire (AWG) B-450 4.5 240V 19 12 B-600 6 240V 25 10 B-750 7.5 240V 32 8 B-900 9 240V 38 8 B-1050 10.5 240V 44 6 B-1200 12 240V 50 6 The data provided above is for 240V single-phased motors. Install an independent circuit breaker between supply line and steam generator. Install a power disconnect within sight of steam generator to cut-off power when not in use.
WIRING DIAGRAM S u p p ly Wa te r L e ve l Se nsor T o C ont rol P a ne l Red ( S h o r t P i n ) Bl ack ( L o n g P i n ) Yel l o w ( M i d d l e P i n ) B lack R ed S u p p ly T o C ont rol P a ne l J2 Black White Red Red Drain water valve B lack Red J1-2 Red Red Red Red Fill water valve Black J1-1 Black J1 Yel low S T e rm i na l B l oc k Ye l l ow / G re e n R ed Black G Black J2-1 Blac k Red ( S h o r t P i n ) Bl ack ( L o n g P i n ) Yel l o w ( M i d d l e P i n ) L2 L1 Red
L2 L1 T o C ont rol P a ne l Drain water valve J2 Black White Red Red Fill water valve Red Red S B lack Red J2-2 Red Red WIRING DIAGRAM S Black J1-1 Black Yel low R ed Black T e rm i na l B l oc k Ye l l ow / G re e n J1 B lack R ed G Black J2-1 Blac k Red ( S h o r t P i n ) Bl ack ( L o n g P i n ) Yel l o w ( M i d d l e P i n ) Red J1-2 Red Wa te r L e ve l Se nsor B lack R ed B-600 S u p p ly Wa te r L e ve l Se nsor L2 L1 T o C ont rol P a ne l Red ( S h o r t P i n ) Bl a
STEAM GENERATOR DISSECTION DIAGRAM 2 1 14 16 3 17 15 4 13 12 6 7 11 INSTALLATION & USER GUIDE 5 10 8 9 1. 2. 3. 4. 5. 6. ENCLOSURE INSULATION BRACKET CIRCUIT BOARD STEAM OUTLET PRESSURE RELIEF VALVE WATER FILL VALVE 7. WATER DRAIN VALVE 8. SUBSIDIARY WATER TANK 9. MAIN WATER TANK 10. HEATING ELEMENT 11. 221 F HI-LIMIT 12. TRANSFORMER 13. TERMINAL BLOCK 14. FUSE 15. GROUND WIRE CONNECTOR 16. RELAY 17.
CARE & USE FOR THE CONTROL PANEL 1. Use soft cloth with a little soap water to clean the control panel. 2. Do not use crude cleaning tools. 3. If the decorating facade is damaged, contact service electrician to change it. Do not install any SteamSpa controls without reading and understanding the SteamSpa generator Installation and Instruction manual.
CONTROLLER SPECS 1. 7 0 I NCH 0.92 I NCH 5. 54 I NCH 0.89 I NCH 4. 78 I NCH 4. 41 I NCH 4 I NCH 5. 54 I NCH 4. 41 I NCH 4 I NCH 1. 70 I NCH 0.92 INCH 0.31 INCH 3. 20 INCH 3. 10 INCH 4. 37 I NCH NO EXTENSION RIM INSTALLATION & USER GUIDE 3. 20 INCH 3. 10 INCH 2. 07 INCH 4. 37 I NCH WITH EXTENSION RIM Page 19 SteamSpa PHONE: 800-856-0172 FAX: 866-560-1060 http://steamspa.com info@steamspa.
CONTROL PANEL INSTALLATION INSTRUCTIONS STEP ONE Determine the installation location of the control panel. The master control panel is designed to be installed in the steam room only, please install: A. Recess mount onto the wall using the control box. 1. 4-5 feet from the ground. 2. Keep away from the steam head and do not expose under the direct spray of steam. 3. Install the4.72” perpendicular wall.the wall using the control box. A.inRecess mount onto 4.
FUNCTIONS LED LIGHT STEAM BLUETOOTH CHROMA LIGHT OPERATIONAL APPROACH 1. START-UP/SWITCH OFF POWER ON The control panel will BEEP when it’s connected to a power source. INSTALLATION & USER GUIDE START-UP When the system is under stand-by mode, press the key to start-up. The current ambient temperature in the room and bluetooth music icon will be displayed on the screen as shown in Figure 1. After the interface is fully displayed, press the function key on the screen to unlock.
4. STEAM FUNCTION Select the steam interface shown in Figure 1 after power-on: Press steam function; The steam key is shown as Figure ; Press the the steam Function. to start the again to stop Steam temperature setting: Set temperature by pressing the key of "temperature+" or "temperature-". Steam time Settings: Set to 5-60 minutes of steaming in 5 minute steps by pressing the “time+” or “time-” keys.
5.CHANGE BETWEEN FAHRENHEIT & CELSIUS Selection "F/C" function bar on the setting interface shown in fig.6 after power on, press OK key to enter the interface shown in Figure 9. Press the "OK" key again to shift between degrees Celsius and Fahrenheit. 6. RESTORE FACTORY SETTINGS FUNCTION Select "Factory Setting" bar on the setting interface, and press the "OK" key shortly to restore the factory parameter. The steam control temperature will return to 110℉ and the steaming time to 30 minutes. 7.
INSTALLATION & USER GUIDE (5)The bluetooth status indicating icon will be flash on the bluetooth interface when the bluetooth equipment is not connected, then, otherwise, it will stop flashing. Secondary Key Pad Reminder: Secondary key pad is not standard part for main keypad,it’s optional 1、When system power off, touching power on/off button on secondary key pad to get normal light and steam function works. 2、When system power on, touch button to stop steam and normal light.
TESTING THE MACHINE 1. Make sure the power switch of the control panel is turned on (the control panel displays ---), and the water supply valve will open. 2. Press the steam switch, , the control panel will display the temperature of the environment, the steam engine begins to input water to start the steam function, and while opening the steam, press the button to open light function. 3. When there is steam output, press again, the steam will stop and the light will go off automatically. 4.
110 figure 2 - clock screen figure 3 - bluetooth screen figure 3 - light screen INSTALLATION & USER GUIDE figure1 - main screen 110 0 Min 110 0 Min 110 0 Min 110 0 Min 110 0 Min figure 4 - user presents figure 5 - se�ngs Page 27 SteamSpa PHONE: 800-856-0172 FAX: 866-560-1060 http://steamspa.com info@steamspa.
figure 8 - clock se�ngs figure 9 - temp se�ngs figure 10 - presents mode INSTALLATION & USER GUIDE figure 7 - schedule screen Page 28 SteamSpa PHONE: 800-856-0172 FAX: 866-560-1060 http://steamspa.com info@steamspa.
STEAM GENERATOR MAINTENANCE IMPORTANT! The steam generator automatically performs a water discharge operation after each use. 1. Wait for the completion of automatic water discharge after each time using the steam generator to make sure the water in the tank is discharged completely before cutting off power supply. 2. There should not be any leakage or damage among the steam generator, steam nozzle, components and pipes. They should be checked and repaired annually. 3.
PROBLEM POSSIBLE CAUSES The machine does not start when powered 1. Burned out fused 2. The electrical wiring became loose 3. Control panel connection loose Breakers are tripping 1. 2. 1. 2. When the machine is started, hot water comes out with little or no steam Check gauge size Damaged heating element Check inlet valve Check cable pins The display screen on the control panel does not display anything 1. The control panel wire is not connected properly 2.
Type Power (KW) Voltage (V) Current (A) Errors Range Anti-Static Constant Insulation Resistance Head Lamp Time Set Range (min) Steam Press (psi) Steam Vol. (cu. in./min) Steam Spray Time (sec) Water Vol. (cu. in.) 4.5KW 6KW 7.5KW 9KW 10.5KW 12KW 4.5 240 19 +10% >1500V >20M Ω ~12V/3W 1-60 3 9 100-180 80 6 240 25 +10% >1500V >20M Ω ~12V/3W 1-60 4 11 180-240 160 7.5 240 32 +10% >1500V >20M Ω ~12V/3W 1-60 4 13 150-210 160 9 240 38 +10% >1500V >20M Ω ~12V/3W 1-60 4 16 120-180 160 10.
STEAM SPA TROUBLE SHOOTING Generator Maintenance and Service should be completed by Licensed Plumber or Electrician *Turn Off Electrical Breaker and Water Supply Before Any Work On Electrical Connection is attempted* UNIT LEAKING WATER OUT OF THE STEAM OUTLET: • • • PSI TO UNIT GREATER THAN 15-20PSI: Confirm that the PSI going to the unit is regulated between 15-20 PSI (Most House Lines Run Off approx. 50-100, (a Pressure Regulating Valve may be required).
STEAM SPA TROUBLE SHOOTING CONTROL PANEL READING EO (WATER LEVEL) ERROR: • • • • • WATER PRESSURE NOT SET CORRECTLY: Confirm that the PSI going to the unit is regulated between 15-20 PSI (Most Homes can have approx. 50-100psi). FLOW TO UNIT NOT REDUCED: Reduce flow of water by closing shut-off valve on water intake line to 20% open and 80% closed.
MAINTENANCE LOG
MAINTENANCE LOG
SIZING CHART *Cabin Dimensions Cubic Feet Generator 3x3x7 63 4kw or 6kw 3x4x7 84 7kw or 9kw 3x5x7 105 9kw or 10.5kw 3x6x7 126 9kw or 10.5kw 3x7x7 147 10.5kw or 12kw 3x8x7 168 12kw 4x4x7 112 9kw 4x5x7 140 9kw or 10.5kw 4x6x7 168 10.