Installation Guide

SteamSpa PHONE: 800-856-0172 FAX: 866-560-1060 http://steamspa.com info@steamspa.com
Page 20
INSTALLATION & USER GUIDE
TESTING THE MACHINE
1. Make sure the power switch of the control panel is turned on (the control panel displays ---), and the water supply valve will
open.
2. The generator must be operating in order to turn the light on or off. (If light was purchased)
3. Press the button to start the steam, the steam will come out of the steam generator in 1 to 2 minutes depending on
generator size. Afterwards, the steam generator will supply water about every minute, the steam will decrease but not stop,
and about 10 seconds later the steam will come out normally. As time goes on, the temperature displayed in the control panel
will rise with the temperature in the room before it stops and stays at the set temperature.
4. Based on different requirements of the user for temperature and steam time, the control panel can adjust temperature and
steam time. While testing the machine, set the time to be 30 minutes and the temperature to be 120F.
5. When the set steam time is due, the system will shut off the steam and light function automatically to stop water input and
steam production .
6. 10 minutes after the steam is shut off, the system will start drainage automatically for 7 minutes. After testing the machine and
it is working properly. Then the machine can be operated normally.
WARNING! Do not dismantle the safety pressure decrease valve arbitrarily.
IMPORTANT! Do not switch the water input pipe when the steam generator is working.
CONTROL PANEL DIAGRAM
1
2
3
4
5
6
8
7
9
10
M
1. POWER ON/OFF
2. TIME/TEMP SET
3. TIME/TEMP DECREASE
4. TIME/TEMP INCREASE
5. LIGHT ON/OFF
6. MEMORY (MEMORY ONLY
ON DUAL SYSTEMS)
7. DIGITAL DISPLAY SCREEN
8. STEAMSPA LOGO
9. FRONT DECORATIVE BEZEL
10. TEMP SENSOR