Information
Connecting energy meters to StecaGrid coolcept / coolcept³
inverters
WIM Version: 11/11/2016
Connecting energy meters to StecaGrid coolcept / coolcept³ inverters
Page
2
of
14
After connecting the StecaGrid coolcept / coolcept³ inverter to an energy meter via the data connection
cable you must then make the following energy management settings in the inverter menu.
Pressing the "SET" button brings you to the "Main menu"
Fig. 2 Status display
Select the "Settings" item in the main menu
Fig. 3 Main menu
Select the "Energy management" item in the "Settings" menu
Fig. 4 Settings
Select "Energy meter" in the "Mode" screen
Fig. 5 Mode
W
Fig. 6 Dynamic feed limitation
Select the "Meter type" item in the "Configuration" menu
Fig. 7 Meter type
In the "Dyn. feed in control" screen, set the maximum power that
may be fed into the public mains grid
(This can be e.g. 70% of the max. PV generator power)