4.7 Initial commissioning of the inverter
4.7.1 Function
Conditions for starting initial commissioning
Initial commissioning starts automatically when at least the AC connector has been installed and
switched on as described previously. If initial commissioning is not fully completed then it starts
again anew the next time the device is switched on.
Guided initial commissioning
Initial commissioning is a guided procedure that sets the following information:
n Display language
n Date / Time
n Country
n Reactive power characteristic curve (if prescribed for the selected country)
Setting the country
The following applies when setting the country:
n The country set must always be the same as the country where the inverter is installed. This
ensures that the inverter will load the specified net parameters of the respective country; for
more information, refer to the Countries table on the Steca homepage,
www.steca.com/Wechselrichter-Wohnsiedlung.
n The country can only be set once!
Contact the Steca Technical Support if you have set the wrong country.
n If the Countries table does not list your country, select a country with stricter specifications.
n The country setting does not affect the language used on the display. The display language is
set separately.