4.8 Feed-in management
Depending on the country, photovoltaic systems must have the possibility of being reduced in the
fed-in effective power by the network operator. The following products are recommended for imple-
menting this legally prescribed specification:
n StecaGrid SEM
n WEB'log from Meteocontrol
n Solar-Log from Solare Datensysteme
n Energy-Manager from Kiwigrid
Furthermore, an energy meter can be used for feed-in management. It must be connected to the
Modbus RTU interface and meet the preconditions specified in
Ä
Chapter 3.6.7 „Modbus
RTU“ on page 31 and
Ä
Chapter 3.6.8 „Modbus RTU data connection cable“ on page 32.
NOTICE!
The settings for feed-in management must be made in the sub-menu 'Energy management'.
Mode
1. Press SET to call up the item.
2.
Press s to select "Energy meter".
3. Press SET.