User manual
n The country set must always be the same as the country where the inverter is installed. This
causes the inverter to load the prescribed grid parameters for the selected country; more infor-
mation on this is provided in the
country table
below.
n The country can only be set once!
Contact your installer if you have set the wrong country.
n Contact your installer if you cannot select the country where your inverter is installed.
n The country setting does not affect the language used on the display. The display language is
set separately.
4.7.2 Operation
Starting initial commissioning
✔
The check list for initial commissioning is displayed:
n The default display language is English.
n The Language entry is selected.
n The check boxes are not selected.
———————————————————————————
NOTICES
n When a check list item is called up the corresponding
check box is automatically selected.
n The following items are only displayed when the use of a
reactive power characteristic curve is prescribed for the
country currently selected in the Country item:
– Reac. pwr. ch. c. (type of reactive power char-
acteristic curve)
– No. of nodes
1)
– Node 1
1)
– Node 2
1)
– Node n
1)
2)
– Display char. curve
1)
: Is only displayed for reactive power characteristic
curve type Enter char. curve.
2)
: Is only displayed when no. of nodes has been set
to a value > 2.
n Initial commissioning is completed by calling up the
Finish item.
n Finish can only be performed when
all other
check
boxes are selected.
———————————————————————————
1.
Press rs to select a check list item.
2. Press SET to call up the item.
The items are described in detail below.