User manual

n The country set must always be the same as the country where the inverter is installed. This
causes the inverter to load the prescribed grid parameters for the selected country; more infor-
mation on this is provided in the
country table
below.
n The country can only be set once!
Contact your installer if you have set the wrong country.
n Contact your installer if you cannot select the country where your inverter is installed.
n The country setting does not affect the language used on the display. The display language is
set separately.
4.7.2 Operation
Starting initial commissioning
The check list for initial commissioning is displayed:
n The default display language is English.
n The Language entry is selected.
n The check boxes are not selected.
———————————————————————————
NOTICES
n When a check list item is called up the corresponding
check box is automatically selected.
n The following items are only displayed when the use of a
reactive power characteristic curve is prescribed for the
country currently selected in the Country item:
Reac. pwr. ch. c. (type of reactive power char-
acteristic curve)
No. of nodes
1)
Node 1
1)
Node 2
1)
Node n
1)
2)
Display char. curve
1)
: Is only displayed for reactive power characteristic
curve type Enter char. curve.
2)
: Is only displayed when no. of nodes has been set
to a value > 2.
n Initial commissioning is completed by calling up the
Finish item.
n Finish can only be performed when
all other
check
boxes are selected.
———————————————————————————
1.
Press rs to select a check list item.
2. Press SET to call up the item.
The items are described in detail below.
GB
747.431 | Z08 | 2014-01-31