User manual

Table Of Contents
RESULT
The project window is split to show two tabs at the same time. The selected tab is moved to the
new tab group.
Moving tabs to another tab group
You can move tabs to other tab groups.
PREREQUISITE
You have opened at least two tabs and they are both shown in the same project window.
PROCEDURE
Click and drag the tab into the target tab group.
RELATED LINKS
Opening new tabs on page 52
Moving tabs to other windows
You can move tabs to another open window of the same project to show the corresponding
layouts in a new window.
NOTE
The layouts must belong to the same project. If you attempt to move a tab to a window of a
different project, a new window is created for the project to which the layout belongs.
You can only move tabs to other windows if you have opened at least two tabs.
PROCEDURE
Do one of the following:
To create a new window of the same project with the tab inserted, click and drag a tab
horizontally to the right/left, away from the tab bar and release it.
To insert the tab into the tab bar of another window of the same project, click and drag a
tab onto the tab bar.
Select a tab, right-click it, and choose Move Tab To New Window from the context
menu.
Select a tab and choose Window > Move Tab To New Window.
Opening multiple project windows
You can open multiple project windows for the same project, for example, if you want to work on
multiple layouts at the same time. You can also show a different mode of the same project in
each window, such as having one window show Write mode and another show Play mode.
During playback, all windows that belong to the same project show the playhead and move the
view to follow the music during playback.
PROCEDURE
Open a new project window in any of the following ways:
Press Ctrl/Cmd-Shift-T .
User interface
Workspace setup
55
Dorico SE 3.1.10