Use and Care Manual
3
INSASGH1015
SPECIFICATIONS
CEILING FAN HEATER
VOLTS 240/208
WATTS 4000/3000
AMPERAGE 16
COLOR RED, YELLOW OR STAINLESS STEEL
WEIGHT 10 LB / 4.5 KG
TECHNICAL DRAWINGS
INSTALLATION
KO 7/8''
BACK
11 3/4"
298.5mm
FRONT
13 3/4"
349.7mm
SIDE
5 1/2"
140mm
INSTALLATION
This unit is designed to be installed on the surface of a nished ceiling,.
This product must be installed a minimum of 8 ft (2.4 m) and a maximum of 10 ft (3.04 m) from the oor. This height interval is recommended for
optimum performance.
Also, keep at least 12 inches away from any vertical surfaces or walls (see Fig.1).
Use BX or ROMEX wires only.
1. Remove the external cover of the unit and set aside (4 screws, Fig. 2).
2. Remove the mounting bracket (1 screw and hook, Fig. 2)
3. Screw the mounting bracket to the ceiling and make sure the ceiling structure is strong enough to support the unit. Make sure the mounting
bracket is installed in such a way that the unit will sit straight and level. (Fig. 2)
4. Hook the slotted side of the internal assembly to the mounting bracket. Let the unit hang from the bracket. (Fig. 2 & 4)
5. Make sure a wall mounted thermostat is installed to control the heater.
6. Provide a sufficient length of wire to facilitate the connections, which are made while the unit is still hanging from the bracket. (Fig. 4)
7. Remove the back wiring cover and knock out the 7/8 K.O. (Fig. 3). Insert a cable connector (not supplied) and pass the feed wire through it.
8. Make the electrical connections using the supplied wirenuts. Connect the ground wire. Make sure all connections are secure and tight (Fig. 3).
WARNING - To avoid a short circuit, keep the stripped ground section wire inside the back wiring cover.
9. Replace the back wiring cover. Swing the other half of the internal assembly into position and screw the assembly to the bracket with the screw(s)
previously removed in step 2. (Fig. 4)
10. Optional; To prevent any possible vibration, use two (2) No. 8 screws with anchors (not supplied) (Fig 4.5)
11. Replace the external cover and screw it into place with the four screws removed in step 1.
12. Test the unit to make sure it is running properly.
13. For field inspection; remove cover j-box for wiring diagram. (Fig. 5)