Use and Care Manual
4
INSELN0418
5
INSELN0418
TABLE DE RÉVISION
REV. DATE DESCRIPTION MODIFIÉ PAR | MODIFIED BY
2014-10-24 / tdinh
2014-10-23
3rd ANGLE PROJECTION
1 / 1
M-XXXXX
xxxxx
X:\03_R&D\DEVELOPPEMENT\04-CV_CVAC\2013\CV-003 Refonte El-Nino V2\Dessin pour manuel d'installation\ELN - vue de la carte
3e ANGLE DE PROJECTION
XXXXX
TOLÉRANCES SI NON-SPÉCIFIÉES | TOLERANCES IF NOT SPECIFIED
LINÉAIRE | LINEAR: ANGULAIRE | ANGULAR:
EMPLACEMENT:
MIS À JOUR | UPDATED:
CONSENT OF STELPRO DESIGN.
CRÉÉ LE | CREATED ON:
CRÉÉ PAR | CREATED BY:
DESCRIPTION:
# PIÈCE | PART #:
.XX = ±.03" [ ±.76mm]
.XXX = ±.015" [ ±.38mm]
XX° = ±1°
XX.X° = ±0.5°
FEUILLE | SHEET:
FORMAT | SIZE:
A
L'INFORMATION CONTENUE DANS CE DOCUMENT EST
LA PROPRIÉTÉ DE STELPRO DESIGN. EN AUCUN CAS,
L'INFORMATION NE PEUT ÊTRE UTILISÉE, SAUF SOUS
AUTORISATION ÉCRITE DE STELPRO DESIGN.
THE INFORMATION IN THIS DOCUMENT IS THE
PROPERTY OF STELPRO DESIGN. IN ANY CASE, THE
INFORMATION CAN'T BE USED, EXCEPT THE WRITTEN
MATÉRIEL | MATERIAL:
After reinforcing the side of the installation hole (for drywall), remove the surface sleeve and insert the wall plate assembly in order to mark the
mounting holes. Then secure the unit to the wall supports (joist and building block). Replace cover, do not forget to connect the ground wire.
SURFACE INSTALLATION
FLOOR
minimum 15 " (see table)
7"
178mm
REINFORCEMENT
STUD
FIG. 3 FIG. 4 FIG. 5
FIG. 3
FIG. 1
FIG. 4
FIG. 2
FIG. 5
CONTROLS
Your EL-NIÑO hand dryer is equipped with electronic controls to customize the unit to meet your needs.
FOUR OPERATIONAL MODES - DESCRIPTION AND SYMBOLS
ULTIMATE – High air speed and full heating power for quick drying
COMFORT – Reduced air speed and moderate heating power for a comfortable noise level and heat range
ECONOMICAL – High air speed without heat for quick drying with energy and cost savings
HARMONY – Reduced air speed without heat for energy savings and a moderate noise level
THREE SENSITIVITY DETECTIONS - DESCRIPTION AND SYMBOL
Maximal detection – standard (4’’)
Medium detection - decreased
Minimal detection - minimum
FOR OPERATIONAL ADJUSTMENTS BY A QUALIFIED TECHNICIAN, FOLLOW THESE STEPS
1. Disconnect electricity to unit at breaker.
2. Remove cover by executing steps from Fig. 1 to 3 on the page 3.
3. Determine the operation mode and desired sensitivity by choosing the desired conguration of dip switches SW1 and SW2 as shown on the
diagram here.
4. Replace cover and restore electricity.
NB : Never leave a powered unit (without its cover) unattended.
Determine the location you want the hand dryer and screw the two top anchor screws as per the above dimensions and leave the screws out
about 1/2 inch (13mm).
Suspend the hand dryer on the two top anchor screws, locate the bottom holes and secure the unit to the wall with the two bottom anchor screws.
Connect power cable to the hand dryer. Replace cover, do not forget to connect the ground wire.