Instruction Manual

GRN4-605 Chapter 5: Maintenance 37 of 93
Chapter 5: Maintenance
5-1 Preventative Maintenance Schedule
Only trained and specialized personnel should carry out maintenance work.
Maintenance Plan
Danger caused by electrical voltage and starting the machine during
maintenance work. Death can result!
ALWAYS turn main switch to 0, safeguard using a padlock, and attach
a warning sign while carrying out maintenance work.
The tasks for maintenance work are described below.
Perform the following after every 8 operation hours:
Check protective devices.
Check cutting cutter mountings.
Check condition of cutting cutters.
Perform the following after every 40 operation hours:
Check V-belt tension force and V-belt condition.
Check all screws of the machine for a tight fit.
Check wearing parts.
Check hydraulic oil level and consistence.
Per form the following after every 2000 operation hours:
Change hydraulic oil
Check gearbox oil level
Yearly maintenance:
The purpose of yearly maintenance is primarily to check the general condition of
the machine and to arrange for the supply of any necessary replacement parts. A
service engineer can carry out this request.