Product Manual A

L
L
G
FIGURE 2
Attach the center plate (G) on the Connecting Part of 2 Bridge Bases (A)
with 6 pieces of screws (L) as shown.
B
E
E
E
E
C
D
FIGURE 3
Insert 4 pieces of Rail (E) into the Left Post (B). Middle Post (C)
and Right Post (D) as shown. Repeat for second hand rail.
L
FIGURE 4
Attach the Posts to the Bridge Base (A) together with 8 pieces of bolt, nut and
washer sets (I) and (J). Use 2 sets of large bolt, nut and washer (I) for each
center post and use 1 set of medium bolt, nut and washer (J) for each end
post. Secure the posts and rails to each other with 16 pieces of screws (L)
and tighten all of the bolts and screws.
MADE IN CHINA
I
J
J
L
L
L
H
H
H
H
H
H
FIGURE 5
Insert 6 Solar Lights (H) into the pre-drilled holes on post tops. Assembly
complete.