User's Manual

STONEX R2 PLUS
38
4. Input height from the surveying point to the
position to be stake out. Then press F4: [
OK] to set the
data.
5. Press F1: [
REM] to begin REM stake out
measurement. Move telescope to find the point to be
stake out.
: Move the telescope near the zenith
: Move the telescope near the nadir
Press key {
ESC} back to stake out mode.
S-O Ht 9.562
SD 10.251m
VA 79.6986gon
HA 249.0404gon I
MEAS REM
S-O Ht
Ht. 2.000m
Tgt.H 0.000m
MOKS