Instructions / Assembly
   Installation & Assembly Instructions 
Please contact our Customer Service Division with any questions at: 
30700 D Carter Street ∙ Solon, OH 44139 ∙ (P) 440.248.5480 ∙ support@tritonproducts.com   
      For a full line of products visit www.tritonproducts.com   1 INS3535  
Read all instructions completely before installing. Should you have any questions about your installation, please call 
Customer Service at 440-248-5480. Missing and damaged parts must be reported within 5 days from receipt of delivery. 
Tools needed for this installation (Not Supplied with Kit) 
Lever - Pencil or marker - Phillips head screw driver – Electric drill – ½” Standard drill bit for hollow wall installation – 
Safety glasses – 5/16” Masonry bit for concrete block installation – 1/16” Standard drill bit for stud wall installation – Tape 
measure     
Parts Listing 
P/N#    Qty    Description          Qty   
Hardware______________________   
10-01815T  1    Top Track Sections         5  2-1/2” Toggle Bolts   
10-0280-1T  2    Top Hang Rail with hanging Slots     6  3-1/2” Toggle Bolts      
10-0280-2T  2    Bottom Hang Rail Section      11  White Plastic Wall Anchors 
10-0280-3T  2    Hang Rail Connector with 2 bolts    11  2-1/4” Wood Screws 
10-0480  1    31” Wire Shelf          11  Toggle Bolt Expanders 
10-0336  1 Set    Hanging Brackets for Wire Shelf     1  Hex Head Wrench for Hang Rails 
10-0580  1    31” Combination Rail        10  Assorted LocHooks for Tool Board 
10-0880  1    LocBoard Tool Board         3  Plastic Hanging Bins 
10-1901  1    31” Wire Basket         3  Assorted Combination Rail Hooks 
10-2001  1 Set    Hanging Brackets for Wire Basket 
We have included all mounting hardware for hollow and concrete block wall installations. It is not necessary to mount system 
to wood studs. Each system will require 35 lineal Inches of wall space for mounting and a minimum ceiling height of 7-1/2 feet 
high for proper clearance. 
Drill Diameter Listing: Drill diameter sizing for hollow wall installations: Use 1/2” standard drill bit 
  Drill diameter sizing for concrete wall installations: Use 5/16” masonry drill bit 
  Drill diameter sizing for wood Stud wall Installations: Use 1/16” standard drill bit for pilot holes 
 Preparation for Top Track Installation: (Image A-1)  
1.  When installing in a corner, leave 1” space between side wall and your top track. 
2.  Determine the maximum height of  storage  you would like available  above  your  system.  (See Fig. A-1).  For  an  8 foot 
ceiling; 78” off the floor leaves 18” of storage above and 81” leaves 15” storage above.  
3.  Using a tape measure, mark your desired height off the floor with a 4” long pencil mark.  
4.  (Refer to Fig. A-1 & A-2) Using a level, align top of top track with your pencil mark in step 3.  With top track level, mark 
the center  of each hole’s location on your  wall.  (Note: Before starting  to  drill holes always make sure  all  screw  hole 
locations do not fall in line with electrical wires, duct work or plumbing inside of your wall. If a potential problem exists, 
reposition and remark screw hole locations.) 
5.  (Fig. A-2) Drill hole locations marked using the correct drill diameter sizing and type listed above.  Should you come in 
contact with wood studs, stop and mark the hole with X and after drilling all other holes come back and drill these holes 
using a 1/16” bit for pilot hole for wood screws. 
Attachment of Top Track to Wall Surfaces: (Fig. A-3) 
6.  For hollow walls; (Fig. A-3) Use 2-1/2” long toggle bolts with expanders. Insert all toggle bolts through top track and 
attach  all  toggle  bolt  expanders.  Omit  toggle  bolts  that  fall  in  line  with  X  or  wood studs.  Insert  toggle  bolts  with 
expanders into holes in wall before starting step 9. 
7.  For concrete walls; use white plastic wall anchors and 2-1/4” long wood screws. Install all plastic wall anchors in all hole 
locations before starting step 9. 
1785 - Storability® 33"L x 63"H Garage Storage System 




