ogue Eco Design Installation User Instructions

9
User Instructions
5.3 To create an open stack for top down lighting:
1. Place two medium sized logs parallel on the base of
the firebox.
2. Place two smaller logs on top running parallel across
the bottom logs.
3. Continue to build the stack using smaller logs and
place firelighters in the centre.
4. Finish the stack by adding two further logs and placing
firelighters on top. Add extra smaller kindling if desired.
13
1
2
3
4
5.4 Light the upper firelighters. This will create a flame that will
ignite the logs/ kindling whilst warming the flue to accelerate
the flue draw, see Diagram 14.
14
5.5 Adjust the operating air controls to the maximum, or
start-up, setting and close the door.
5.6 Leave the fire to establish and develop a glowing firebed
(this may take 30 to 45min or more in some cases).
5.7 Once the fire is established refuel as described in Section 8.
Do not load fuel above the log guard and the secondary
combustion chamber at the back of the rebox, See
Diagram 15.
Wood
Multi-Fuel
Log bar
Log bar
Secondary Combustion Chamber
Secondary Combustion Chamber
15
5.8 Close the door and follow the instructions for Running
the Appliance.
Do not run with the door slightly open except for initial
lighting as this could cause over-ring and damage the
appliance.